10 Service Position
Note:
Checking of all Major P.C.B. (S-Video P.C.B, Main P.C.B., DSP P.C.B., Volume P.C.B., Panel P.C.B. & Fuction P.C.B.) can be
carried out using below procedures.
For the disassembling procedure, see Section 9.
10.1. Checking the DSP P.C.B. (Side A) & S-Video P.C.B.
1. Remove Top Cabinet.
2. Remove Rear Panel.
3. Disassembly of S-Video P.C.B..
10.2. Checking the Main P.C.B., Panel P.C.B., Function P.C.B., Volume
P.C.B. & DSP P.C.B. (Side B)
1. Remove Top Cabinet.
2. Remove Rear Panel.
3. Disassembly of Front Panel.
4. Disassembly of Panel P.C.B., Function P.C.B., Volume P.C.B., S-Video P.C.B., Main P.C.B. & DSP P.C.B..
5. Flip the PCBs over (see as shown in picture below).
16
SA-HT17PP
Содержание SA-HT17PP
Страница 8: ...7 Operation Procedures 8 SA HT17PP ...
Страница 9: ...8 Remote Control 9 SA HT17PP ...
Страница 11: ...9 2 P C B Positions 11 SA HT17PP ...
Страница 54: ...18 1 Cabinet Parts Location 18 1 1 Cabinet 54 SA HT17PP ...
Страница 55: ...55 SA HT17PP ...
Страница 65: ...18 4 Packaging 65 SA HT17PP ...
Страница 66: ...66 SA HT17PP PRT0503P S J E A M ...