66
Step 9 Put aside Main P.C.B..
Step 10 Attach with 22P extension FFC (Part No.
RFKZBT200E2) from CN503 to CN8501.
Step 11 Upset Main P.C.B..
Step 12 Attach with 28P extension FFC (Part No.
RFKZBT200E1) from CN506 to P58008.
Step 13 Process to check and service Side B of Main P.C.B..
Caution: Insulated material is required to insulate Main
P.C.B from other parts.
10.2. Checking & Servicing of SMPS
P.C.B.
Step 1 Release the tabs at the bottom of the front panel assem-
bly.
Step 2 Remove top cabinet.
Step 3 Detach 7P FFC at the connector (CN506) on Main
P.C.B..
Step 4 Detach 20P FFC at the connector (CN806) on Main
P.C.B..
Step 5 Release the tabs at each side at the front panel assem-
bly in the direction of arrow.
Содержание SA-BT300PX
Страница 15: ...15 5 3 Using BD LIVE or BONUSVIEW in BD Video ...
Страница 18: ...18 5 5 Speaker Connections ...
Страница 21: ...21 5 7 About MP3 JPEG files ...
Страница 38: ...38 9 2 Main Components and P C B Locations ...
Страница 63: ...63 9 28 6 Grease ...
Страница 64: ...64 9 28 7 How to Clean the Lens of Optical Pick UP Follow the 9 2 1 Upper Base Ass y ...
Страница 82: ...82 ...
Страница 88: ...88 ...
Страница 90: ...90 ...
Страница 118: ...118 ...
Страница 120: ...120 ...
Страница 124: ...124 19 1 3 BD Mechanism Cabinet ...