11.11. Disassembly of Top Bar LED
P.C.B.
•
Refer to “Disassembly of Top Cabinet”.
•
Refer to “Disassembly of Front Panel Unit”.
Step 1
Remove 2 screws.
Step 2
Lift up the Lighting Cover.
Step 3
Release 2 catches.
Step 4
Remove the Top Bar LED P.C.B..
Step 5
Place the Top Bar LED P.C.B. on the insulated material.
Step 6
Desolder 2P Cable Wire at ZJ6600 on the Top Bar LED
P.C.B..
11.12. Disassembly of Bottom Bar
LED P.C.B.
•
Refer to “Disassembly of Top Cabinet”.
•
Refer to “Disassembly of Front Panel Unit”.
Step 1
Remove 2 screws.
Step 2
Lift up the Lighting Cover.
43
Содержание SA-AKX95
Страница 14: ...5 General Introduction 5 1 Media Information 14 ...
Страница 15: ...6 Location of Controls and Components 6 1 Remote Control Key Button Operation 15 ...
Страница 16: ...6 2 Main Unit Key Button Operation 16 ...
Страница 26: ...9 1 2 Main P C B Front Side Fig 2 Main P C B Front Side 26 ...
Страница 30: ...9 3 D Amp IC Operation Control AKX95 105 30 ...
Страница 34: ...34 ...
Страница 36: ...11 2 Main Components and P C B Locations 36 ...
Страница 145: ...19 2 Electrical Replacement Part List 145 ...