8.3.
Reliability Test Mode (CD Mechanism Unit (BRS11C))
Below is the process flow chart of the aging test for the CD Mechanism Unit (BRS11C).
Fig. 1. Reliability Test (Loading)
Fig. 2. Reliability Test (Traverse)
Fig. 3. Reliability Test (Combination)
OPEN
Oper
a
tion
OPEN w
a
it
for 1 s
CLOSE
Oper
a
tion
CLOSE w
a
it
for 4 s
Count up
First Tr
ac
k
A
cc
ess
First Tr
ac
k
Pl
a
y 5 s
L
a
st Tr
ac
k
A
cc
ess
L
a
st Tr
ac
k
Pl
a
y 5 s
Count up
First Tr
ac
k
A
cc
ess
A
cc
ess
Pl
a
y 10 s
Open
Oper
a
tion
Open w
a
it
for 1 s
CLOSE
Oper
a
tion
Count up
First Tr
ac
k
L
a
st Tr
ac
k
L
a
st Tr
ac
k
Pl
a
y 10 s
22
Содержание SA-AKX95
Страница 14: ...5 General Introduction 5 1 Media Information 14 ...
Страница 15: ...6 Location of Controls and Components 6 1 Remote Control Key Button Operation 15 ...
Страница 16: ...6 2 Main Unit Key Button Operation 16 ...
Страница 26: ...9 1 2 Main P C B Front Side Fig 2 Main P C B Front Side 26 ...
Страница 30: ...9 3 D Amp IC Operation Control AKX95 105 30 ...
Страница 34: ...34 ...
Страница 36: ...11 2 Main Components and P C B Locations 36 ...
Страница 145: ...19 2 Electrical Replacement Part List 145 ...