5. Installation of Cassette Up Ass’y
A. Confirm that the Locking Tab (L-4) under the Cassette Up Ass’y is in
Hole on the Mechanism Chassis when installing the Cassette Up
Ass’y. Then, slide the Cassette Up Ass’y towards the back.
B. When installing 2 Screws (S-8), slide the Holder Unit (Refer to "
METHOD FOR LOADING/UNLOADING OF MECHANISM
" in Service
Notes) to tighten screws. Then, slide it back to the EJECT Position.
C. Hook Spring (P-1) to the Drive Rack Arm on the Mechanism Chassis.
6.2. MECHANISM SECTION
6.2.1. Disassembly/Reassembly Method
31
Содержание Quasar Omnivision PV-V4021-K
Страница 9: ...2 Fault indication will be displayed in F I P as shown Fig 2 2 FIg 2 3 9 ...
Страница 13: ...5 1 4 1 3 Service Position 2 2 Model M N Fig 4 2 2 13 ...
Страница 27: ...Fig D2 6 1 2 1 Notes in chart 27 ...
Страница 30: ...Fig D5 2 30 ...
Страница 32: ...32 ...
Страница 33: ...6 2 2 Inner Parts Location Fig J1 1 33 ...
Страница 34: ...34 ...
Страница 36: ...Fig J2 1 2 36 ...
Страница 67: ...11 2 MECHANISM BOTTOM SECTION 67 ...
Страница 68: ...11 3 CASSETTE UP COMPARTMENT SECTION 68 ...
Страница 69: ...11 4 CHASSIS FRAME AND CASING PARTS SECTION Model PVQ V201 PV V4021 PV V4021 K VHQ 401 PV V4511 PV V4521A 69 ...
Страница 70: ... Model PV V4511 PV V4521 PV V4521 K VHQ 451 70 ...
Страница 71: ... Model PV V4611 71 ...
Страница 73: ... Model PV V4611 73 ...
Страница 78: ...12 2 MECHANICAL REPLACEMENT PARTS LIST MECHANICAL REPLACEMENT PARTS 78 ...
Страница 81: ... 81 ...
Страница 88: ... 88 ...
Страница 90: ...90 ...
Страница 95: ...95 ...
Страница 105: ...105 ...
Страница 109: ...109 ...
Страница 145: ...1 2 Schematic Diagram Circuit Board Layout 2 ...