After replacing EEPROM IC (IC6005) or Main C.B.A., be sure to perform the "PG SHIFTER
ADJUSTMENT" in ELECTRICAL ADJUSTMENT procedures.
5.1.4. SERVICE POSITION
5.1.4.1. Service Position
CAUTION:
HOT CIRCUIT (Primary circuit) exists on the Main C.B.A.
Use extreme care to prevent accidental shock when servicing.
5.1.4.1.1. Service Position (1)
Fig. 4-1
5.1.4.1.2. Service Position (2-1)
(Model: A, B, C, D, E, F, G, H, I, J, K, L)
Fig. 4-2-1
12
Содержание Quasar Omnivision PV-V4021-K
Страница 9: ...2 Fault indication will be displayed in F I P as shown Fig 2 2 FIg 2 3 9 ...
Страница 13: ...5 1 4 1 3 Service Position 2 2 Model M N Fig 4 2 2 13 ...
Страница 27: ...Fig D2 6 1 2 1 Notes in chart 27 ...
Страница 30: ...Fig D5 2 30 ...
Страница 32: ...32 ...
Страница 33: ...6 2 2 Inner Parts Location Fig J1 1 33 ...
Страница 34: ...34 ...
Страница 36: ...Fig J2 1 2 36 ...
Страница 67: ...11 2 MECHANISM BOTTOM SECTION 67 ...
Страница 68: ...11 3 CASSETTE UP COMPARTMENT SECTION 68 ...
Страница 69: ...11 4 CHASSIS FRAME AND CASING PARTS SECTION Model PVQ V201 PV V4021 PV V4021 K VHQ 401 PV V4511 PV V4521A 69 ...
Страница 70: ... Model PV V4511 PV V4521 PV V4521 K VHQ 451 70 ...
Страница 71: ... Model PV V4611 71 ...
Страница 73: ... Model PV V4611 73 ...
Страница 78: ...12 2 MECHANICAL REPLACEMENT PARTS LIST MECHANICAL REPLACEMENT PARTS 78 ...
Страница 81: ... 81 ...
Страница 88: ... 88 ...
Страница 90: ...90 ...
Страница 95: ...95 ...
Страница 105: ...105 ...
Страница 109: ...109 ...
Страница 145: ...1 2 Schematic Diagram Circuit Board Layout 2 ...