2. Confirmation/Alignment of Intermediate Gear B, Main Cam Gear,
and Intermediate Gear A
A. Confirm that the Hole A on Lift Gear is a Through Hole with a
hole on chassis.
B. Confirm that the hole on Intermediate Gear A is aligned with the
hole on Lift Gear.
Fig. J3-3
C. Install the Intermediate Gear B so that the hole on the
Intermediate Gear B is aligned with the hole on the Main Cam
Gear.
Fig. J3-4
3. Holes on Main Cam Gear
A. The EJECT mode Hole on Main Cam Gear should be a Through
31
Содержание PVD4742 - DVD/VCR DECK
Страница 1: ...ORDER NO MKE0201800C1 B3 DVD VCR DECK PV D4742 SPECIFICATIONS 1 ...
Страница 23: ...Fig D2 23 ...
Страница 27: ...5 2 1 Disassembly Reassembly Method 5 2 2 Inner Parts Location Fig J1 1 27 ...
Страница 28: ...5 2 3 EJECT Position Confirmation Fig J1 2 28 ...
Страница 54: ...7 SCHEMATIC DIAGRAMS 54 ...
Страница 56: ...10 2 MECHANISM BOTTOM SECTION 56 ...
Страница 57: ...10 3 CASSETTE UP COMPARTMENT SECTION 57 ...
Страница 58: ...10 4 CHASSIS FRAME AND CASING PARTS SECTION 58 ...
Страница 59: ...10 5 PACKING PARTS AND ACCESSORIES SECTION 59 ...