2. Insert a Tension Meter into tape path and measure the back tension.
Fig. M2-1
3. If the reading is out of specification, make sure that there is no dust or
foreign material between the Brake Pad of Tension Control Arm Unit
and the S Reel Table.
After cleaning, the reading of tension measurement is still out of
specification, replace the Tension Arm Unit and the Tension Control
Arm Unit.
Fig. M2-2
Note:
1. Be sure that the three probes of the meter are all in solid contact with
the tape, but not touching any other parts of the mechanism.
2. It is recommended that measurements should be repeated at least
three (3) times because the tension meter is very sensitive to external
vibrations.
6.2.2.2. TAPE INTERCHANGEABILITY ADJUSTMENT
Note:
To perform these adjustment/confirmation procedures, enter the
Tracking center mode.
45
Содержание PV-D4733S-K
Страница 4: ...3 1 2 ELECTRICAL REPLACEMENT PARTS LIST 4 EXPLODED VIEW 4 1 CHASSIS FRAME AND CASING PARTS SECTION 4 ...
Страница 15: ...R1522 ERJ6GEYJ103V MGF CHIP 1 10W 10K 15 ...
Страница 45: ...Fig 16 1 Fig 16 2 6 1 4 2 REMOVAL OF CSP IC Fig 16 3 45 ...
Страница 46: ...6 1 4 3 INSTALLATION OF CSP IC Fig 16 4 46 ...
Страница 47: ...Fig 16 5 47 ...
Страница 48: ...6 1 4 4 CSP IC LOCATION Fig 16 6 48 ...
Страница 134: ...Fig D2 22 ...
Страница 139: ...5 2 2 Inner Parts Location Fig J1 1 27 ...
Страница 140: ...5 2 3 EJECT Position Confirmation Fig J1 2 28 ...
Страница 147: ...5 2 8 Capstan Motor Unit Fig J6 5 2 9 T Loading Arm Unit and S Loading Arm Unit Fig J7 1 35 ...
Страница 152: ...5 3 CASSETTE UP ASSEMBLY SECTION 5 3 1 Top Plate Wiper Arm Unit and Holder Unit Fig K1 1 40 ...
Страница 168: ...10 2 MECHANISM BOTTOM SECTION 56 ...
Страница 169: ...10 3 CASSETTE UP COMPARTMENT SECTION 57 ...
Страница 170: ...10 4 CHASSIS FRAME AND CASING PARTS SECTION 58 ...
Страница 171: ...10 5 PACKING PARTS AND ACCESSORIES SECTION 59 ...
Страница 187: ...75 ...
Страница 192: ...80 ...
Страница 194: ...82 ...
Страница 202: ...90 ...