http://cxema.ru
the frame as shown in
Fig. D6
.
Fig. D6
5. SERVICING POSITION
Fig. D7
3.2. MECHANICAL ADJUSTMENT PROCEDURES
Refer to the Service Manual for Z-Mechanism Chassis. / (Order No. VRD9802005C2)
3.3. ELECTRICAL ADJUSTMENT PROCEDURES
3.3.1. TEST EQUIPMENT
The following equipments are required for Electrical Adjustments.
1. Dual-Trace Oscilloscope
- Voltage Range: 0.005-5V/div
- Frequency Range: DC-35MHz
- Probes: 10:1 / 1:1
2. Frequency Counter
- Frequency Range: 0-10MHz
- Probes: 1:1
3. Universal Counter
4. Digital Volt Meter (D.V.M.)
Содержание NV-SJ422EE
Страница 18: ...http cxema ru 3 3 8 CIRCUIT BOARD LAYOUT ...
Страница 47: ...1 A C E B D F 3 5 7 2 4 6 8 VEP06E00K HOT ...
Страница 50: ...http cxema ru 10 2 CASING PARTS SECTION ...
Страница 51: ...http cxema ru 10 3 PACKING PARTS SECTION ...
Страница 52: ...http cxema ru ...
Страница 59: ...http cxema ru ...
Страница 61: ...http cxema ru ...
Страница 63: ...http cxema ru ...
Страница 68: ...http cxema ru ...
Страница 70: ...http cxema ru ...
Страница 72: ...http cxema ru ...
Страница 74: ...http cxema ru ...