9. COMPONENT TEST PROCEDURE
CAUTION
1. High voltage is present at the high voltage
terminal of the high voltage transformer during any
cook cycle.
2. It is neither necessary nor advisable to attempt
measurement of the high voltage.
3. Before touching any oven components, or
wiring, always unplug the oven from its power
source and discharge the high voltage capacitor.
9.1. Primary latch switch, secondary (secondary latch switch and
power relay B) interlocks.
1. Unplug the lead connectors to Power Relay B and verify
continuity of the power relay B 1-2 terminals.
2. Unplug lead connectors to primary Latch switch and Secondary
Latch Switch.
3. Test the continuity of switches at door opened and closed
positions with ohm meter (low scale). / Normal continuity readings
20
Содержание NN-K153WF
Страница 3: ...3 ...
Страница 4: ...1 SCHEMATIC DIAGRAM NN K103WF 2 SCHEMATIC DIAGRAM NN K153WF NN K123MF 4 ...
Страница 16: ...16 ...
Страница 17: ...12 DIGITAL PROGRAMMER CIRCUIT NN K153WF K123MF PARTS LIST 17 ...
Страница 20: ...law 2 ...
Страница 21: ...3 ...
Страница 26: ...5 SCHEMATIC DIAGRAM NN K152WF 8 ...
Страница 44: ...find the exact cause of any trouble 11 1 Digital programmer circuit troubleshooting guide 26 ...
Страница 45: ...11 2 How to check the semiconductors using an OHM meter 12 EXPLODED VIEW AND PARTS LIST 27 ...
Страница 51: ...33 ...
Страница 52: ...19 DIGITAL PROGRAMMER CIRCUIT PARTS LIST 34 ...