6.8. Pump
1. Remove water tank from escutcheon base.
2. Keep pressing [Steam Deforst] pad for more than 2
seconds to drain the water remaining in the water pipes and
tubes into oven cavity.
3. Pull out tube A connecting to pump from copper pipe.
4. Disconnect all wiring connectors from D.P.C board AU.
5. Remove 1 grounding screw holding on cavity front plate.
6. Open the door of oven, slide the escutcheon base upward
and out slightly.
7. Pull out tube B from inlet of pump.
8. Remove 2 screws holding pump bracket on escutcheon
base.
9. Slide out pump bracket from bottom rail of escutcheon
base.
10. Slightly uplift the pump over the locking tabs on the pump
bracket, then slide the pump out.
11. Pull out tube A from outlet of pump.
To install pump
1. Insert pump into pump bracket (Inlet of pump must be
aligned toward the harness clasp of pump bracket).
2. After installation confirm that the pump is properly
aligned.
NOTE:
To prevent tube A from slipping out after repairing,
make sure that when inserting tube A into copper
pipe, the inserted depth is not less than 9mm.
17
NN-GS597M
Содержание NN-GS597M
Страница 2: ...2 NN GS597M ...
Страница 3: ...3 NN GS597M ...
Страница 5: ...1 FEATURE CHART 2 CONTROL PANEL 5 NN GS597M ...
Страница 6: ...3 SCHEMATIC DIAGRAM 6 NN GS597M ...
Страница 29: ...10 EXPLODED VIEW AND PARTS LIST 10 1 EXPLODED VIEW 29 NN GS597M ...
Страница 36: ...11 DIGITAL PROGRAMMER CIRCUIT 11 1 SCHEMATIC DIAGRAM 36 NN GS597M ...
Страница 37: ...37 NN GS597M ...