background image

stopped and warning buzzer will sound (All of U and H21), and an error indication will be display
-ed Alphabet and Number alternately.

Indication

Contents

Check point

Method to clear

Malfunction of 
drain

-

Is something wrong with the drain hose?

-

Is lint clogging it?

-

Is it kinked and takes more than 5 min. to reset point?

-

Check if condition of the water level detector.

Opening and closing 
lid.

The lid is open

-

Is the lid open? Close it.

-

Check if magnet on the lid.

-

Check if condition of contact point of the lid switch on the 

PC.Board.

Close the lid.

Unbalanced load -

Has the clothes accumulate into one side?

-

Has the unit been leveled?

Open the lid and 
redistribute the load.

Malfunction of 
Water supply

-

It’s takes over 30min. to reach selected water level.

-

Check if condition of water faucet.

-

Check if condition of the feed valve and PC.Board.

Opening and closing 
lid to return to initial 
stage of water supply.

Water remain at 
drying process

-

Drain water from the tub by spin process.

Remove the power 

Unbalanced 
load at drying

-

Has the clothes accumulate into one side?

-

Has the unit been leveled?

Open the lid and 
redistribute the load.

Child lock 
movement

-

Check if detect of water in the tub.

1. Giving an alarm (10sec).

2. After 10 sec., operate drain action and indicate “U99”.

Remove the power 

Water level 
detector

-

Check if condition of the connectors.

-

Replace water level detector.

-

Replace PC.Board (Power side).

Press Power (Push) 
switch to OFF position.

Malfunction of 
motor TRIAC

-

Replace PC.Board (Power side).

Remove the power 

Short circuit of 
power relay on 
the PC.Board

-

Check if condition of the Power (Push) switch (it shall be 

keeped condition).

-

Replace PC.Board (Power side).

-

Check if no leaking between body and lead wires.

Remove the power 

Data shall not 
be memorized

-

Replace PC.Board (Power side).

-

Effected service mode (Check-B) only.

Press Power (Push) 
switch to OFF position.

Open circuit of 
PC.Board’s 
communication 
line

-

Check if lead wire condition of PC.Board between power and 

operation side, and replace one of PC.Board’s.

Remove the power 

Malfunction of 
thermistor

-

Check if condition of connector.

-

Replace the fan case B (thermistor)

-

Open-circuit 206k   and Short-circuit 94k   

Press Power (Push) 
switch to OFF position.

Water shall be 
leaked from 
filling solenoid 
(feed valve)

-

Clean the diaphragm inside of the filling solenoid (feed 

valve) or replace the filling solenoid (feed valve).

-

Check if output voltage of the PC.Board (Power side).

-

Operate Geared motor and drain water.

Press Power (Push) 
switch to OFF position

15

Содержание NA-F50GD

Страница 1: ...No HUD0310342C3 Washing Machine NA F50GD Product Color White Grey 2003 Matsushita Electric Industrial Co Ltd All rights reserved Unauthorized copying and distribution is a violation of law 1 SPECIFICATIONS 1 ...

Страница 2: ...L 2 3kg Heater 600W 32L 34L 32L 1 2kg Safety switch Lid and unbalance 20L 20L 20L 0 3kg Buzzer Cycle end buzzer Give alarm Standerdized water consumption Normal 118L Thermal protector Motor Softener dispenser Providing Operating Water pressure 0 03 to 1MPa 4 3p s i to 142p s i Bleach inlet Providing Lint filter Providing Auto power off Providing Pulsator r min Clothes load 104 r min Accessories Pr...

Страница 3: ...of the panel and drying function shall be operated by timer control Exhaust air including humid air shall be come out from upper portion of the tub through the exhaust filter Approximate drying time Drying capacity Necessary hours 1 1 5kg Approx 3 4 hours 2 1 0kg Approx 2 3 hours 3 0 5kg Approx 1 2 hours Dryed up conditions shall be changed against atmospheric temperature humidity and installation...

Страница 4: ...ing It is not possible to indicate remaining time more than 100 min due to two digit therefore even select more than 2 hours 2 3 and 4 hours mark shall be indicated at start of drying and indicate proper remaining time from 90 min Remaining time shall be decreased on every one minute 3 2 Use the TUB DRY function to prevent black mold 4 ...

Страница 5: ... 30 minutes The operation is finished when the buzzer sounds NOTE The occurrence of black mold in the tub depends usage environment Once black mold has formed activating Tub Dry remove it 4 CHECK INPUT AND OUTPUT VOLTAGE OF THE PC BOARD 1 Before replace PC Board check input and output voltage of the PC Board 2 Check range of the test meter 3 When check output voltage of the PC Board set a program ...

Страница 6: ...5 OPERATIONS 6 DRYING TIPS 6 ...

Страница 7: ...7 CHECK PRIOR TO START UP 7 ...

Страница 8: ...8 DISASSEMBLY INSTRUCTIONS AND ADJUSTMENTS 8 ...

Страница 9: ...he P C Board for operation side 4 Remove both connectors of the push switch and intermediary lead wire 5 Remove the P C Board from pawls 6 Remove the lead wire holder In case to replace the P C Board for power side 4 Slide the panel A support to frontward to remove 5 Remove the connector of the intermediary lead wire 6 Remove screws mounting the P C Board 5 Remove 5 connectors from the P C Board 9...

Страница 10: ...ctor 5 Remove the pawl holding the water level detector 6 Remove the connector 7 Remove the air hose Replace the filling solenoid feed valve 5 Remove 2 connectors 6 Remove the packing from the filling solenoid feed NOTE Set the packing to the detergent case A and then the filling solenoid feed valve to the detergent case Replace the safety switch 1 Slide the lid hinge shaft to right to remove and ...

Страница 11: ... fan case unit 5 Loosen the hose clamp and remove the air supply 6 Remove 4 pawls of the fun case A and remove the case C Made of steel from inside 7 Remove the heater unit and replace the heater inside the fan case or heater unit Geared motor 1 Lay down the machine on it nothing drain hose side 2 Release the lead wire holder and remove the connector 3 Remove screws mounting the geared motor 11 ...

Страница 12: ...old the body B and pull the rear portion upward slightly And slide the body B frontward as shown in figure Holding pawls at front portion 3 Remove the feed hose and Air supply hose from the outer tub cover 4 Set the body B against a wall 5 Remove 4 screws mounting the outer tub cover to remove it 6 Remove the pulsator 12 ...

Страница 13: ...case 9 TEST RUNNING WITHOUT WATER 9 1 METHOD TO TEST RUNNING WITHOUT WATER 1 Set the power switch to OFF 2 Press and hold both the Water level and Process buttons with one hand 3 Set the power switch to ON 4 Release the your fingers from the buttons and power switch which you pressed in steps 2 and 3 above Check A can be carried out in this state with your fingers released 5 Within three seconds p...

Страница 14: ...Drying process shall be operated 4 minutes Rotate the tub approx 700 rpm and operate the fun 4 E Set water level 1 rank higher than laundry amount detector Change water flow to gentle Press the wash button to change L0 to L1 and press button to confirm Press the course button to change water flow to gentle 5 M Initial set for V belt tension Press Start Hold button to set initial setting for V belt...

Страница 15: ...t Check if detect of water in the tub 1 Giving an alarm 10sec 2 After 10 sec operate drain action and indicate U99 Remove the power Water level detector Check if condition of the connectors Replace water level detector Replace PC Board Power side Press Power Push switch to OFF position Malfunction of motor TRIAC Replace PC Board Power side Remove the power Short circuit of power relay on the PC Bo...

Страница 16: ...ide Press Power Push switch to OFF position Malfunction of heater circuit Check if condition of connector and lead wires Check if condition of the heater and PC Board Power side If the heater is short circuit it will Auto off Press Power Push switch to OFF position 10 LOCATION 10 1 LOCATION OF PARTS A 10 2 REPLACEMENT PARTS LIST A 16 ...

Страница 17: ...lamp AXW245 6DTA 1 A 20 Duct B AXW2298 6LX0 1 A 21 Panel A support AXW132D6LX0 1 White A 21 Panel A support AXW132J6LX0 1 Grey A 22 PC Board w components AXW24C 6PF05 1 220 230V Power side A 23 Case cap AXW2192D6JU0 1 White A 23 Case cap AXW2192J6JU0 1 Grey A 24 Detergent case B AXW2151D6JU0 1 White A 24 Detergent case B AXW2151J6JU0 1 Grey A 25 Fan case A AXW851D6PF00 1 White Inc motor detector A...

Страница 18: ...Grey A 43 Lead wire unit AXW14A 6PF00 1 A 44 Switch instructions AXW657 6PF00 1 Cantonese A 44 Switch instructions AXW657 6PFA0 1 English A 45 Holder B AXW2498Z6PF0 1 1 Screw XTWAXW461 2 2 Screw XTB4 15BFE 15 10 3 LOCATION OF PARTS B 10 4 REPLACEMENT PARTS LIST B 18 ...

Страница 19: ...5U90 1 B 9 Back panel AXW156 5210 1 B 10 Capacitor cover AXW407 6JW0 1 B 11 Capacitor AXW403 7L507 1 230V 50Hz B 11 Capacitor AXW403 7L607 1 220V 50Hz B 14 Outlet hose B AXW2EU5YR0 1 B 15 Filling joint A AXW12H 9025 1 Feed valve joint A B 16 Pressure hose AXW1251 9065 1 B 17 Hose joint sleeve AXW243 5X60 1 B 18 Hose clamp AXW245 5R70 1 B 19 Laundry plate AXW2W 6KC0 1 B 20 Bottom plate AXW2158Z6PF0...

Страница 20: ...10 6 REPLACEMENT PARTS LIST C 20 ...

Страница 21: ... C 16 Pulsator AXW5E 6LX0 1 Inc C 15 C 17 Shaft bushing AXW504 6BM0 1 C 18 Spinner shaft flange nut AXW1517 5U80 1 C 19 Spinner flange washer B AXW1519 8020 1 C 20 OF hose B AXW234 6EM0 1 C 21 Geared motor AXW3482Z2516 1 7W AC single C 22 Hose clamp AXW245 5320 1 C 23 Service hose A AXW2DD6KC0 1 C 24 Mechanism case AXW20A 6PF00 1 C 25 Spinner pulley metal AXW1532 59U0 1 C 26 Clutch spring AXW454 5...

Страница 22: ...J6PFA 1 Grey S pore 2 Operating instructions AXW9901Z6PF0 1 English Cantonese 3 Case B AXW90B 6PF00 1 4 Body cover AXW9004Z6PF0 1 1 set 2 PCs 5 Tub support A AXW9054Z6PF0 1 6 Tub support B AXW9085Z6PF0 1 7 Case sheet AXW9020 6GT0 1 8 Upper sheet AXW9069 6JU0 1 9 Front protection AXW9215Z6PF0 2 10 Rear protection AXW9215Z6PF5 2 11 Upper cover AXW9060Z6PF0 1 22 ...

Страница 23: ......

Страница 24: ......

Страница 25: ......

Страница 26: ......

Отзывы: