Procedure
Figure
3.Remove the hose clamp from the outer tub, and
remove the feed hose A.
4.Remove the nineteen bolts mounting the outer
tub cover by a box wrench (size 10mm).
5.Pull out the outer tub cover to remove.
After remove the outer tub cover
1.Remove the cap by using minus-type screwdriver.
2.Remove a screw mounting the drum cover.
3.Remove the drum cover.
4.Remove the six bolts mounting the drum unit by
the box wrench (size 13mm).
4.Pull out the drum unit to remove.
-35-
17
Replacement
of the drum unit
Description
NA-168VX2/168VG2/148VA2/128VA2/147VB2
Содержание NA-168VX2
Страница 16: ...6 MAINTENANCE Max 6L 16 NA 168VX2 168VG2 148VA2 128VA2 147VB2...
Страница 17: ...17 7 USING THE BUTTONS Start Pause NA 168VX2 168VG2 148VA2 128VA2 147VB2...
Страница 22: ...11 TROUBLESHOOTING 22 NA 168VX2 168VG2 148VA2 128VA2 147VB2 NA 147VB2 only...
Страница 23: ...23 NA 168VX2 168VG2 148VA2 128VA2 147VB2...
Страница 25: ...5 6 G2 G3 E2 E3 7 H C 25 NA 168VX2 168VG2 148VA2 128VA2 147VB2...
Страница 40: ...15 LOCATION OF PARTS A 40 NA 168VX2 168VG2 148VA2 128VA2 147VB2...
Страница 42: ...42 LOCATION OF PARTS B NA 168VX2 168VG2 148VA2 128VA2 147VB2...
Страница 44: ...44 LOCATION OF PARTS C NA 168VX2 168VG2 148VA2 128VA2 147VB2...
Страница 46: ...46 LOCATION OF PARTS D Accessories 5 5 NA 168VX2 168VG2 148VA2 128VA2 147VB2...