Procedure
Figure
After remove the body B
1.Remove the body band B fixing the wringer frame
packing by using 2 long nose pliers.
2.Remove the wringer frame packing.
Note:
Incase to mounting the wringer frame packing A,
cutting portion shall be set to the marking portion
of the outer tub cover.
After remove the body B and wringer frame packing
1.Remove 3 bolts by the spanner (size 10mm).
2.Pull out the Balance weight to remove.
After remove the body B and wringer frame packing,
1.Remove the 3 bolts by the spanner (size 13mm).
Note:
Use gloves in case to remove the bolts.
After remove the body B, wringer frame packing
and both balance weights
1.Remove 3D sensor.(See page-28 replacement of
the 3D sensor)
2.Remove the shower hose, and the sub hose from
the detergent case A.
-34-
13
Replacement
of the wringer
frame packing
14
Replacement
of the balance
weight upper front
15
Replacement
of the balance
weight lower front
Description
16
Replacement
of the outer tub
cover
NA-168VX2/168VG2/148VA2/128VA2/147VB2
Содержание NA-168VX2
Страница 16: ...6 MAINTENANCE Max 6L 16 NA 168VX2 168VG2 148VA2 128VA2 147VB2...
Страница 17: ...17 7 USING THE BUTTONS Start Pause NA 168VX2 168VG2 148VA2 128VA2 147VB2...
Страница 22: ...11 TROUBLESHOOTING 22 NA 168VX2 168VG2 148VA2 128VA2 147VB2 NA 147VB2 only...
Страница 23: ...23 NA 168VX2 168VG2 148VA2 128VA2 147VB2...
Страница 25: ...5 6 G2 G3 E2 E3 7 H C 25 NA 168VX2 168VG2 148VA2 128VA2 147VB2...
Страница 40: ...15 LOCATION OF PARTS A 40 NA 168VX2 168VG2 148VA2 128VA2 147VB2...
Страница 42: ...42 LOCATION OF PARTS B NA 168VX2 168VG2 148VA2 128VA2 147VB2...
Страница 44: ...44 LOCATION OF PARTS C NA 168VX2 168VG2 148VA2 128VA2 147VB2...
Страница 46: ...46 LOCATION OF PARTS D Accessories 5 5 NA 168VX2 168VG2 148VA2 128VA2 147VB2...