Procedure
Figure
3.Turn the large pulley and remove the belt outward.
After remove the rear panel
lay down the washing
machine on it left side
and remove the bottom
plate A.
1.Remove the insulation cover .
Method to fix the lead wire of the motor
connector portion: See page-39.
2.remove the connector.
3.Remove the two bolts mounting the motor by the
box wrench (size 10mm).
4.Pull out the motor.
After remove the rear panel
1.Insert the two holes of the pulley with special tool
(Parts No . JF066), then loosen the nut with spanner
as shown in left figure .
2.Remove the belt.
3.Remove the nut and gasket.
4.remove the pulley.
-38-
24
Replacement
of the Motor
25
Replacement
of the Pulley
Description
NA-168VX2/168VG2/148VA2/128VA2/147VB2
Содержание NA-128VA2
Страница 16: ...6 MAINTENANCE Max 6L 16 NA 168VX2 168VG2 148VA2 128VA2 147VB2 ...
Страница 17: ... 17 7 USING THE BUTTONS Start Pause NA 168VX2 168VG2 148VA2 128VA2 147VB2 ...
Страница 22: ...11 TROUBLESHOOTING 22 NA 168VX2 168VG2 148VA2 128VA2 147VB2 NA 147VB2 only ...
Страница 23: ... 23 NA 168VX2 168VG2 148VA2 128VA2 147VB2 ...
Страница 25: ...5 6 G2 G3 E2 E3 7 H C 25 NA 168VX2 168VG2 148VA2 128VA2 147VB2 ...
Страница 40: ...15 LOCATION OF PARTS A 40 NA 168VX2 168VG2 148VA2 128VA2 147VB2 ...
Страница 42: ... 42 LOCATION OF PARTS B NA 168VX2 168VG2 148VA2 128VA2 147VB2 ...
Страница 44: ... 44 LOCATION OF PARTS C NA 168VX2 168VG2 148VA2 128VA2 147VB2 ...
Страница 46: ... 46 LOCATION OF PARTS D Accessories 5 5 NA 168VX2 168VG2 148VA2 128VA2 147VB2 ...