22
10.7. Kick Plate
1. Remove the right part of the kickplate as it is shown in the
picture.
2. Remove two screws fixing the kickplate.
3. Pull the kickplate left and push it down.
10.8. Front Panel
1. Remove two screws fixing the front panel at the bottom as
it is shown in the picture by using T25.
2. Remove two screws fixing the door lock as it is shown in
the pictures.
Содержание NA-127VB4
Страница 3: ...3 1 Safety Precautions ...
Страница 6: ...6 4 Location of Controls and Components ...
Страница 13: ...13 ...
Страница 43: ...43 12 Dimensions ...
Страница 44: ...44 13 Wiring Connection Diagram 13 1 Wiring Diagram NA 127VB4 and NA 147VB4 ...
Страница 45: ...45 ...
Страница 46: ...46 13 2 Wiring Diagram NA 128VB4 and NA 148VB4 ...
Страница 47: ...47 ...
Страница 51: ...51 14 3 Washing Group Parts 14 3 1 Exploded View Washing Group Parts ...
Страница 56: ...56 14 7 Body Group Parts 14 7 1 Exploded View Body Group Parts ...
Страница 59: ...59 50 PORTHOLE GROUP AXW2DP 55890 1 U 14 9 Accessories 14 9 1 Accessories View 992 988 995 996 997 998 994 989 ...
Страница 61: ...61 14 10 Packaging Group Parts 14 10 1 Exploded View Packaging Group Accessories ...
Страница 62: ...62 ...