6.2.2.5. Installation of Lens P.C.B. with Mount Contact Unit
6.2.2.6. Installation of the Rear Frame Unit
1. Install Rear Frame Unit to Ring Mount Base Unit
with adjusting the rotational phase so as to match
below 3 point of A, B and C.
2. Tighten screw (D) by using the torque driver with specified torque.
- Screw(D)
×
3
- Torque : 14
±
0.5Ncm
1. Install Lens P.C.B. with Mount Contact Unit to
Ring Mount Base Unit so that the screw of the Lens P.C.B. match.
2. Tighten Screw (E) Gently.
- Screw(E)
×
3
3. Insert FPC to connector of Lens P.C.B.
Screw (E)
Screw (D)
Connectors
Screw(E)
BLACK
SILVER
24mm
A
B
C
4
When reusing Ring Mount Base Unit,
tighten with a torque of 12~13Ncm.
(
3 screws should be tightened with same torque
)