
24
7.3.
Service Position
This Service Position is used for checking and replacing parts. Use the following Extension cables for servicing.
7.3.1.
Extension Cable Connections
CAUTION-1. (When servicing FLASH P.C.B.)
1. Be sure to discharge the capacitor on FLASH P.C.B.
Refer to "HOW TO DISCHARGE THE CAPACITOR ON FLASH P.C.B.".
The capacitor voltage is not lowered soon even if the AC Cord is unplugged or the battery is removed.
2. Be careful of the high voltage circuit on FLASH P.C.B.
3. DO NOT allow other parts to touch the high voltage circuit on FLASH P.C.B.
No.
Parts No.
Connection
Form
1
RFKZ0494
FP9003 (MAIN) - CCD UNIT
45PIN 0.3 FFC
2
RFKZ0581
FP9005 (MAIN) - LENS UNIT
47PIN 0.3 FFC
3
VFK1541
FP9004 (MAIN) - PS9901 (TOP OPERATION P.C.B.)
40PIN B to B
4
VFK1906
PP8001 (FLASH P.C.B.) - PS9903 (TOP OPERATION P.C.B.)
20PIN B to B
Содержание Lumix DMC-TZ18EB
Страница 8: ...8 Note Above caution is applicable for a battery pack which is for DMC TZ18 ZS8 series as well...
Страница 13: ...13 4 Specifications...
Страница 15: ...15 5 Location of Controls and Components...
Страница 16: ...16...
Страница 25: ...25 8 Disassembly and Assembly Instructions 8 1 Disassembly Flow Chart 8 2 P C B Location...
Страница 27: ...27 8 3 2 Removal of the Rear Case Unit Fig D2 1 Fig D2 2...
Страница 28: ...28 Fig D2 3 8 3 3 Removal of the Front Case Unit Fig D3...
Страница 29: ...29 8 3 4 Removal of the LCD Unit Fig D4 8 3 5 Removal of the Frame Plate Fig D5...
Страница 30: ...30 8 3 6 Removal of the Top Case Unit Fig D6 8 3 7 Removal of the Flash Unit Flash P C B Fig D7...
Страница 31: ...31 8 3 8 Removal of the Top Operation P C B Fig D8 8 3 9 Removal of the Lens Unit Fig D9...
Страница 33: ...33 8 3 13 Battery Case Unit Fig D13...
Страница 67: ...S 16...