INSTALLATION AND CONNECTIONS
© Panasonic Industrial Devices SUNX Co., Ltd. 2019
3-5
3-3 Wiring the Controller Connector on the Sensor Head Connection
Cable
3-3-1 Disassembly Procedure
1.
Slide the protective cover in the direction of the arrow.
Protective cover
2.
Press down on the wire insertion hole lever (white) with a flat-head screwdriver (tip width
2mm or less), and remove the wire.
Flat-head screwdriver
Lever (white)
3-3-2 Wiring Procedure
1.
Using the "STRIP GAUGE" on the side of the unit, strip the wire so that the core wire length
is 7 to 8mm, and twist the core wires several times.
Core wire
length
7 to 8mm
Wire
2.
Using a flat-head screwdriver with a tip width of 2mm or less, press down until the lever
(white) on the operation unit until the lever locks.
Tip width
2mm or less
Flat-head screwdriver
Lever (white)
Содержание HG-S Series
Страница 2: ... Panasonic Industrial Devices SUNX Co Ltd 2019 2 MEMO ...
Страница 7: ...1 1 Chapter 1 INTRODUCTION 1 1 Safety Cautions 1 2 1 2 Safety Information 1 2 ...
Страница 44: ... Panasonic Industrial Devices SUNX Co Ltd 2019 3 24 MEMO ...
Страница 72: ... Panasonic Industrial Devices SUNX Co Ltd 2019 4 28 MEMO ...
Страница 75: ... Panasonic Industrial Devices SUNX Co Ltd 2019 5 3 MEMO ...
Страница 174: ... Panasonic Industrial Devices SUNX Co Ltd 2019 5 102 MEMO ...
Страница 175: ...6 1 Chapter 6 SPECIFICATIONS 6 1 Specifications 6 2 6 2 Dimensions 6 7 ...
Страница 188: ... Panasonic Industrial Devices SUNX Co Ltd 2019 6 14 MEMO ...
Страница 198: ... MEMO ...