21
7 Service Fixture & Tools
7.1.
When Replacing the Main P.C.B.
After replacing the MAIN P.C.B., be sure to achieve adjustment.
The adjustment instruction is available at “software download” on the “Support Information from NWBG/VDBG-AVC” web-site in
“TSN system”, together with Maintenance software.
7.2.
Service Position
This Service Position is used for checking and replacing parts. Use the following Extension cables for servicing.
Table S1 Extension Cable List
No.
Parts No.
Connection
Form
1
RFKZ0448
FP6001(MAIN) - MONITOR FPC
33PIN 0.3 FFC
2
RFKZ0444
PP6001(MAIN) - PS6401(SD HOLDER)
50PIN 0.5 B to B
3
VFK1480
FP6003(MAIN) - ECM HOLL FPC(FRONT CASE UNIT)
6PIN 0.5 FFC
4
VFK1440
FP6402(SD HOLDER) - TOP OPERATION UNIT(SIDE CASE-R UNIT) 10PIN 0.5 FFC
Содержание HDC-SD80P
Страница 9: ...9 3 5 Formatting...
Страница 10: ...10 4 Specifications...
Страница 11: ...11...
Страница 23: ...23 8 3 1 Removal of the Top Case Unit Fig D1 Fig D2...
Страница 24: ...24 8 3 2 Removal of the Side Case L Unit Fig D3 Fig D4 8 3 3 Removal of the Front Case Unit Fig D5...
Страница 26: ...26 Fig D10 Fig D11 8 3 6 Removal of the ESD P C B Unit HDC TM80 only Fig D12...
Страница 27: ...27 8 3 7 Removal of the Battery P C B Fig D13 Fig D14...