background image

Installation and Configuration

18

3

3.1 Grounding Cable Connection

The chassis of the equipment must be grounded properly so that the lightning can flow to 
the ground, which improves the capability of the chassis for resisting the electromagnetic 
interference.

1.  Ensure that the grounding cable is connected correctly so that the equipment is 

protected against lightning and interference. The correct connection of the grounding 
cable is an important measure to ensure the human safety.

2.  Connect the chassis to the ground by using a grounding cable. The grounding resistance 

must be smaller than 0.10 ohms and the gauge of the grounding cable must be no less 
than 18 AWG and the length is 50 cm.

3.  The ground installed screw shall comply with 3.5mm minimum in nominal thread 

diameter, and engage at least two complete threads into metal chassis with appropriate 
fixing hardware like washer.

4.  The grounding cable shall not be removed while normal operating, servicing or 

maintenance.

5.  Installation steps:

Step 1:  Ensure the detachable power supply cord removed.
Step 2:  Use the screwdriver to turn the screws on the earth ground screw point.
Step 3:  Strip one end of the ground wire to the ground hole of system.
Step 4:  Connect the other end of the ground wire to a suitable grounding point of 

building at your side.

 

Figure shows the grounding points.

Back panel

Green/Yellow 
Ground cable
1. 18 AWG min.
2. 50 cm

Grounding point

Building

Mains Power 
Switch
earth 
terminal

Содержание GA-ML16TPoE+

Страница 1: ...ing Hub Please read the Important Safety Instructions on pages from 3 to 6 Any problems or damage resulting from disassembly of this Switching Hub by customers are not covered by the warranty I1019 0 Printed in Japan GA ML4TPoE Model No PN260493N TH PN260493N MY PN260493N ID PN260493N SG 2 12 7 Higashi Shimbashi Minato ku Tokyo Japan 105 0021 2019 ...

Страница 2: ...fications 1 3 Accessories 1 4 Basic operation 2 Part Names and Functions 2 1 LED display change 2 2 PoE power supply function 3 Installation and Configuration 3 1 Grounding Cable Connection 3 2 Mounting on a wall 3 3 Mounting to rack 3 4 Configuration of IP address Basic Troubleshooting 3 7 8 8 9 11 11 12 15 17 18 18 19 20 21 23 ...

Страница 3: ...to fire electric shock and or equipment failure Do not damage the power cord Do not bend too tightly stretch twist bundle with other cord pinch put under a heavy object and or heat it Damaged power cord could lead to fire short and or electric shock Do not unplug nor plug in the power plug with wet hands Deviation could lead to electrical shock and or equipment failure Do not insert nor drop forei...

Страница 4: ...nect the Switching Hub via the supplied power cord to the outlet which is connected to the ground If the outlet is not connected to a ground connect the ground cable to the ground terminal screw Connect the power cord firmly to the power port Otherwise this might cause electrical shocks and malfunctions Unplug the power cord if the STATUS ECO LED Status ECO mode blinks in orange system fault Devia...

Страница 5: ...ub was not designed nor manufactured with the intention that it be used for applications in use with railways aviation and medical care etc whereas the influence rate due to communications failures is extremely high in regard to systems that directly affect systems and human lives which require extremely high reliability Be aware of glitches which are caused in the usage environments such as age r...

Страница 6: ...conducted to this Switching Hub through the power supply or ground wire connected to the power port leading to malfunction If a lightning surge current voltage may flow in through the power supply or ground wire it is recommended that you install a surge protective device SPD on the power port side of this Switching Hub 6 CAUTION To connect a power receiving equipment supporting IEEE802 3at to thi...

Страница 7: ...light Possible condensation High low temperature exceeding the specifications environment Strong vibration and or strong shock Failure to satisfy the conditions above may result in a fire electric shock equipment failure and or malfunction Such events are not covered by the warranty If it is used beyond the operating environmental temperatures then the protective devices will start working and the...

Страница 8: ...otely configure the PoE settings for each port Ports 1 to 4 The connection status for each port is detected by the power saving mode and it can suppress the power consumption to required volumes when not linked up Factory default deactivated Rapid Spanning Tree Protocol is supported allowing to build a system with redundancy The IEEE802 1p compatible QoS function is supported Supports triple authe...

Страница 9: ... 6 ports per group VLAN IEEE802 1Q tagging VLAN protocol compatible Max 256 groups including the default VLAN Port based VLAN Internet Mansion function QoS IEEE802 1p compatible Supports 8 priority queues Management method ZEQUO assist Plus Supplied CD ROM SNMP v1 v2c v3 Telnet SSH v2 Console WEB control screen Scheduled to be supported Power supply function Ports 1 to 4 support the IEEE802 3at af...

Страница 10: ...External dimensions 44 mm Height 210 mm Width 260 mm Depth Excluding protruding sections Operating environment Temperature 0 50 C Humidity 20 80 RH no condensation If it is used beyond the operating environmental temperatures then the protective devices will start working and the Switching Hub power will be shut off ...

Страница 11: ...witching Hub operates at AC 100 240 V 50 60 Hz When power is supplied all the LEDs are turned ON Then POWER LED Power lights in green STATUS ECO LED Status ECO mode lights in orange and self diagnosis of hardware is executed On completion of self diagnosis POWER LED Power STATUS ECO LED Status ECO mode and TEMP LED Temperature sensor light in green and the Switching Hub starts operation as a Switc...

Страница 12: ...bridge and Switching Hub can be connected to this port Install the device so that the length of twisted pair cable CAT5e or above becomes 100m or less SFP extension slot ports 5 6 Install SFP module It becomes exclusive usage with twisted pair port When SFP extension slot is linked the ports is automatically switched to SFP extension mode SFP port supports only the full duplex communication Consol...

Страница 13: ...ensor Green Light The system is normally operating Orange Blink The temperature exceeded the set threshold of the internal temperature sensor Set threshold of the internal temperature sensor 74 C factory default STATUS ECO LED Status ECO mode Green Light Operating in status mode Green Blink Operating in ECO mode All Port LEDs left are turned off Orange Light Starting Orange Blink Malfunction Conta...

Страница 14: ...hed at full duplex Off Link is established at half duplex or no device is connected Green Light Orange Blink Off LOOP HISTORY Green Light Loop has been detected within the last 3 days Off No loop detection history It is shut off via the loop detection and shutoff function storm control or the BPDU guard PoE are being supplied power Power is not being supplied or the PoE receiving equipment are not...

Страница 15: ...If the mode is changed to the GIGA mode DUPLEX mode or loop history mode and the LED display switch button is not used for one minute or longer the mode automatically returns to a Base mode Status mode or ECO mode The Base mode is maintained even after the power is turned OFF Indication on the front panel and LED lamps You can display the following items using the LED display switch button Display...

Страница 16: ...op history mode The Base mode is maintained even after the power is turned OFF LED lamps for each mode and LED lamps for ports 1 to 6 correspond as shown in Table 1 see page 14 Turns on the port LED with a orange light when a loop occurs in the corresponding port The Loop shutoff mode has the following 2 types of modes Block mode factory default When loops are detected the port statuses are automa...

Страница 17: ...f the ports whose power supply have been stopped blink orange The priority settings for the power supply can be set and changed from the console etc Power supply while the PoE LIM LED is blinking orange overload caused by the total power supplied by the Switching Hub When the power supply which is requested exceeds 30 W via a single port and the port LED right blinks orange and the power supply is...

Страница 18: ...ounding cable must be no less than 18 AWG and the length is 50 cm 3 The ground installed screw shall comply with 3 5mm minimum in nominal thread diameter and engage at least two complete threads into metal chassis with appropriate fixing hardware like washer 4 The grounding cable shall not be removed while normal operating servicing or maintenance 5 Installation steps Step 1 Ensure the detachable ...

Страница 19: ...ain unit which are included in the separately sold mount brackets PN71053 and connect the four holes on the sides of the Switching Hub to the four holes on the mount brackets Then firmly fasten the Switching Hub to the wall with the four screws which the customer has prepared Right side Left side Screw holes for wall mount brackets ...

Страница 20: ...t brackets and eight screws for fixing the rack mount brackets to the Switching Hub supplied with the mount brackets to fix the mount brackets to the four holes on one side of the Switching Hubs Then use the two connection brackets and eight screws for fixing the connection brackets supplied with the mount brackets to securely fix the connection brackets to the connection screw holes on the front ...

Страница 21: ...g command Screen 3 enable configure config interface vlan 1 config if ip address 192 168 1 254 255 255 255 0 5 Enter the following command to save the setting config if exit config exit copy running config startup config 6 Since the following screen is displayed enter Y and the settings will be saved Screen 4 Confirm that the settings have been normally saved Screen 5 7 After configuring start wit...

Страница 22: ...TPoE config interface vlan 1 GA ML4TPoE config if ip address 192 168 1 254 255 255 255 0 GA ML4TPoE config if GA ML4TPoE Product Number PN260493N Firmware Version x x x xx MAC Address 00 50 40 xx xx xx Serial Number xxxxxxxxxxx UserName manager Password GA ML4TPoE enable GA ML4TPoE configure GA ML4TPoE config interface vlan 1 GA ML4TPoE config if ip address 192 168 1 254 255 255 255 0 GA ML4TPoE c...

Страница 23: ...T 100BASE TX or 1000BASE T standard Auto negotiation may have failed Check the port settings of this Switching Hub or the terminal settings Is the correct Port LED display mode selected using the LED display switch button The Port LED left lights in orange Loop is occurring By removing the loop orange LED will be turned off LOOP HISTORY LED Blinks in orange This is to notify that there is a port i...

Страница 24: ... a CAT5e or better straight cable RJ45 8 8 used Is the cable connected to the port 1 4 that supports PoE power supply Ensure that either the port alone or the entire equipment is not overloaded Is the Powered Device connected to the port compliant with the IEEE802 3at standard or IEEE802 3af standard Is the upper threshold of the power supply manually Manual set in the range of 15600 30000 mW When...

Отзывы: