Panasonic FV-10VEC2 Скачать руководство пользователя страница 9

9

DUCT INSTALLATION

This method draws return air from specific points in the house and supplies an equal 

amount of outside air into the return air duct of the air furnace.

Return air ducts of ERV should be installed in areas of the home where the poorest indoor 

air quality exists (bathroom and kitchen).

The air furnace blower should be running when the ERV is operating to evenly distribute the 

outside air throughout the house.

Method

ⅠⅠ

   

- Partially dedicated ducted installation 

Note

(1)The ERV unit must be balanced.

(2)It is mandatory that HVAC/AHU signal cord be 

    connected.

(3)Check local codes and authority having

     jurisdiction for acceptance. 

Note

(1)Must Have 2-3 ft straight run on all duct attachments points before elbow is more

     than 2 ft (610 mm).

(2)Unit is normally balanced on high speed with the furnace blower on.

(3)The distance between two outdoor hoods please see P.11.

(4)The airflow must be confirmed on site using the balancing procedures found in P.13.

Air

furnace

(914 mm) 

Min.

Dampers for

balancing airflows

OA

EA

RA

SA

Outdoors

Return air

Return air

36” 

Return air from various parts of home. 

(i.e. bathrooms, kitchens, utility areas)

Содержание FV-10VEC2

Страница 1: ...ailure to comply with instructions could result in personal injury or property damage Please explain to users how to operate and maintain the product after installation and this booklet should be pres...

Страница 2: ...f fire or electric shock do not use this unit with any solid state control device This symbol is used to alert users to a specific operating procedure that must be followed in order to operate the uni...

Страница 3: ...ear the fan motor fixture or wiring cover For general ventilating use only Do not use to exhaust hazardous or explosive materials and vapors Sufficient air is needed for proper combustion and exhausti...

Страница 4: ...into the incoming cold air and pre cooling and reducing the humidity of the incoming hot air This helps maintain a fresh environment even when the heating or cooling system is not operating Heating Co...

Страница 5: ...l Neutral Earth ground Live Live WHITE BLACK GREEN Wire Nuts FV 10VEC2H FV 10VE2H Only FV 10VEC2H R JUNCTION BOX GREEN WHITE BLACK GROUND NEUTRAL LIVE R G G Installation work and electrical wiring mus...

Страница 6: ...the HVAC AHU please open knock out holes for wall switch and boost switch connection only 4 Insert wires into the corresponding terminals deeply through the ribs Make sure the screw of terminal secure...

Страница 7: ...e on wall bracket according to the distance between studs Unit inches mm A B 24 609 6 16 406 4 19 482 6 17 1 2 444 5 14 1 2 368 3 22 1 2 571 5 A B Stud 4 long screws ST4 2X30 Stud Wall bracket Floor E...

Страница 8: ...t straight run on all duct attachments points before elbow is more than 2 ft 610 mm 2 Unit is normally balanced on high speed with the furnace blower on 3 A minimum separation of 40 inches 1 m is reco...

Страница 9: ...allation Note 1 The ERV unit must be balanced 2 It is mandatory that HVAC AHU signal cord be connected 3 Check local codes and authority having jurisdiction for acceptance Note 1 Must Have 2 3 ft stra...

Страница 10: ...and living areas Method Fully dedicated ducted installation Note 1 The ERV unit must be balanced 2 Check local codes and authority having jurisdiction for acceptance Note 1 Must Have 2 3 ft straight...

Страница 11: ...o the OA and EA adapter 1 2 Attach duct rigid galvanized duct etc to the SA and RA adapter Please refer to the local codes for detail The intake side duct must be connected to the outside and at least...

Страница 12: ...ains are not supplied Please purchase chains which must be subjected to the weight of 66 lbs 30 kg or above 2 Make sure ERV is horizontal after installation Note Chain Hanger Hanger Install Hanger Ins...

Страница 13: ...on off 1 2 3 4 SA knob Set the supply air volume with this knob The factory default is 100 CFM The unit will consume some electricity unless you turn off the main switch OPERATION Note The SA air vol...

Страница 14: ...the customer to set as ASHRAE 50 min h SA 90 CFM EA 90 CFM ON ON OFF when boost switch is ON ERV enforces the instructions ASHRAE 60 min h SA 100 CFM EA 100 CFM when boost switch is OFF ERV restores...

Страница 15: ...C 104 F 40 C FV 10VE2 FV 10VE2H OA damper open Heat exchange mode Outside air OA Exhaust air EA Supply air SA Return air RA Supply air SA Return air RA Example of FV 10VEC2 and FV 10VEC2H Outdoor tem...

Страница 16: ...wer by switching off main switch first then unplug before working on unit when it is in default mode CAUTION Routine maintenance must be performed every 2 or 3 months clogged filters may cause condens...

Страница 17: ...pi3 min pi3 min It is suggested to replace the OA filter every 6 months Please fill in beginning time on new OA filter before replacing Please replace OA filter by Panasonic Model FV FL0810VE1 or FV F...

Страница 18: ...iring connect SA motor error please disconnect the power and contact the dealer for repair Off Blink 2 s Blink 2 s EA motor error please disconnect the power and contact the dealer for repair OA dampe...

Страница 19: ...6 SPECIFICATIONS Weight Ib For FV 10VEC2 and FV 10VEC2H To ensure quiet operation of the ENERGY STAR certified H ERV each product model must be installed using sound attenuation techniques appropriat...

Страница 20: ...c com Panasonic Corporation 2023 Issue date 05 2023 Warning Concerning Removal of Covers The unit should be serviced by qualified technicians only Your product is designed and manufactured to ensure a...

Отзывы: