6
WIRING DIAGRAM
INSTALLATION
Ⅰ
(BETWEEN JOIST MOUNTING)
Top view of the recommended installation.
1.Make a hole of 10
10 inch(270
270mm in the ceiling between j ist.(Fig.1)
X
X
o
2.Assemble the hanger unit
Insert the suspension
and put the adaptor
(Fig.2)
brackets into hanger
holder
into the hanger
holder.
The bathroom size may affect the
room heating result of this product.
10 (270)
10 (270)
Fig.2
Fig.1
Suspension
brackets
Hanger
holder
Adaptor
Unit:inches(mm)
Wall
Air duct
Product
Bathroom
Bathtub
63(1600)
31 (800)
17
(450)
Unit:inches(mm)
1
"
2
3"
4
3"
5
3"
5
3"
5
3
"
5