9
EN
How to start collective operation
To start collective operation (ALL or ZONE)
Stop
Power
Turn the power supply switch on 5 hours or more before starting operation.
1
Press the SELECT button and select ALL or ZONE.
In case of ZONE collective operation.
2
Select the ZONE No. to be operated by pressing ZONE button.
3
Press the ON button.
4
Set the operation mode by pressing the MODE button.
5
Set the desired temperature by pressing one of the temperature setting buttons
.
6
Set the desired fan speed by pressing the FAN SPEED button.
7
Select the control mode.
Stop
Confi rming the ZONE No. to be selected or ALL indication, press the OFF button.
In the ALL or ZONE mode, no fl ap setting can be performed. If necessary, you should select
the GROUP mode and use the FLAP button.
NOTE
CZ-64ESMC2̲all.indb 9
CZ-64ESMC2̲all.indb 9
2011/09/07 14:37:50
2011/09/07 14:37:50
Содержание CZ-64ESMC2
Страница 43: ...43 GR 1 2 5 ON ON OFF CZ 64ESMC2 all indb 43 CZ 64ESMC2 all indb 43 2011 09 07 14 38 05 2011 09 07 14 38 05...
Страница 59: ...59 RU 1 2 5 CZ 64ESMC2 all indb 59 CZ 64ESMC2 all indb 59 2011 09 07 14 38 12 2011 09 07 14 38 12...
Страница 66: ...CZ 64ESMC2 all indb 66 CZ 64ESMC2 all indb 66 2011 09 07 14 38 15 2011 09 07 14 38 15...
Страница 67: ...UK CZ 64ESMC2 CZ 64ESMC2 all indb A CZ 64ESMC2 all indb A 2011 09 07 14 38 15 2011 09 07 14 38 15...
Страница 69: ...67 UK 1 2 5 CZ 64ESMC2 all indb Sec1 67 CZ 64ESMC2 all indb Sec1 67 2011 09 07 14 38 15 2011 09 07 14 38 15...
Страница 77: ...CZ 64ESMC2 all indb 75 CZ 64ESMC2 all indb 75 2011 09 07 14 38 19 2011 09 07 14 38 19...