10.4. Balance refrigerant of the 2-way,3-way walves
(Gas leakage)
(Indoor unit)
(Liquid side)
(Outdoor unit)
2-way
valve
(Gas side)
Open
3-way
valve
Open
Low
High
Open
Closed
Vacuum pump
Procedure
1.
2.
Leave the valve on the charge set closed.
Connect the charge hose with the push-pin to the
service port.
Confirm whether the pressure indicates more than 1
kg/cm G (0.1MPa).
Confirm that both the 3-way valve and 2-way valve are
set to the open position.
Connect the charge set to the 3-way valve’s service
port.
2
45
Turn on refrigerant reclaiming equipment to collect the
refrigerant until the needle indicates 0 (no refrigerant
is remaining).
4.
5.
Open the valve (Low side) on the charge set and
discharge the refrigerant until the gauge indicates 0.05
MPa (0.5 kg/cm G) to 0.1 MPa (1 kg/cm G).
2
2
If there is no air in the refrigeration cycle (the pressure
when the air conditioner is not running is higher than 0.1
MPa (1 kg/cm G), discharge the refrigerant until the
gauge indicates 0.05 MPa (0.5 km/cm G) to 0.1 MPa (1
kg/cm G). If this is the case, it will not be necessary to
apply a evacuation.
Discharge the refrigerant gradually; if it is discharged
too suddenly, the refrigeration oil will also be
discharged.
2
2
2
3.
Connect the charge set’s centre hose to refrigerant
reclaiming equipment.
CS-PC12DKD / CU-PC12DKD / CS-PA12DKD / CU-PA12DKD
Содержание CU-PC12DKD
Страница 35: ...CS PC12DKD CU PC12DKD CS PA12DKD CU PA12DKD 35...
Страница 62: ...62 CS PC12DKD CU PC12DKD CS PA12DKD CU PA12DKD...
Страница 63: ...63 CS PC12DKD CU PC12DKD CS PA12DKD CU PA12DKD...