b. Copper pipes
Use only copper pipes with the thickness given in table 10, and with minimal impurities. Because the surface of the pipe is
exposed, you should take special care, and also take measures such as marking the pipes to make sure they are easily
distinguished from other piping materials, to prevent mistaken use.
3. Precautions during refrigerant piping work
Take the following precautions on-site when connecting pipes. (Keep in mind that the need to control the entry of moisture and
dust is even more important that in conventional piping).
a. Keep the open ends of all pipes sealed until connection with AC equipment is complete.
b. Take special care when doing piping work on rainy days. The entering of moisture will degrade the refrigerating machine
oil, and lead to malfunctions in the equipment.
c. Complete all pipe connections in as short a time as possible. If the pipe must be left standing for a long time after removing
the seal, it must be thoroughly purged with nitrogen, or dried with a vacuum pump.
11.4. Installation, transferring, servicing
11.4.1.
Inspecting gas leaks with a vacuum pump for new installations (Using new
refrigerant piping)
1. From the viewpoint of protecting the global environment, please do not release refrigerant into the atmosphere.
a. Connect the projecting side (pin-pushing side) of the charging hose for the manifold gauge to the service port of the 3-way
valve. (1)
b. Fully open the handle Lo of the manifold gauge and run the vacuum pump. (2) (If the needle of the low-pressure gauge
instantly reaches vacuum, re-check step a).)
c. Continue the vacuum process for at least 15 minutes, then check to make sure the low-pressure gauge has reached -0.1
MPa (-76 cmHg). Once the vacuum process has finished, fully close the handle Lo of the manifold gauge and stop the
vacuum pump operation, then remove the charging hose that is connected to the vacuum pump adaptor. (Leave the unit in
that condition for 1-2 minutes, and make sure that the needle of the manifold gauge does not return.) (2) and (3)
d. Turn the valve stem of the 2-way valve 90
°
counter-clockwise to open it, then, after 10 seconds, close it and inspect for a
gas leak (4)
e. Remove the charging hose from the 3-way valve service port, then open both the 2-way valve and 3-way valve. (1) (4)
(Turn the valve stem in the counter-clockwise direction until it gently makes contact. Do not turn it forcefully).
f. Tighten the service port cap with a torque wrench (18 N.m (1.8 kgf.m)). (5) Then tighten the 2-way valve and 3-way valve
caps with a torque wrench (42 N.m (4.2 kgf.m)) or (55 N.m (5.5 kgf.m)). (6)
g. After attaching each of the caps, inspect for a gas leak around the cap area. (5) (6)
Precautions
• Be sure to read the instructions for the vacuum pump,
vacuum pump adaptor and manifold gauge prior to use, and
follow the instructions carefully.
• Make sure that the vacuum pump is filled with oil up to the
designated line on the oil gauge.
• The gas pressure back flow prevention valve on the
charging hose is generally open during use. When you are
removing the charging hose from the service port, it will
come off more easily if you close this valve.
Fig. 12 Vacuum pump air purging configuration
Содержание CS-F24DTE5
Страница 18: ...18 4 Dimensions 4 1 CS F24DTE5 CS F28DTE5 ...
Страница 19: ...19 4 2 CS F34DTE5 CS F43DTE5 CS F50DTE5 ...
Страница 20: ...20 4 3 CU J24DBE5 CU J24DBE8 CU J28DBE5 CU J28DBE8 ...
Страница 21: ...21 4 4 CU J34DBE5 CU J34DBE8 CU J43DBE8 CU J50DBE8 ...
Страница 22: ...22 5 Refrigeration Cycle 5 1 CS F24DTE5 CU J24DBE5 CU J24DBE8 CS F28DTE5 CU J28DBE5 CU J28DBE8 ...
Страница 23: ...23 5 2 CS F34DTE5 CU J34DBE5 CU J34DBE8 CS F43DTE5 CU J43DBE8 CS F50DTE5 CU J50DBE8 ...
Страница 24: ...24 6 Block Diagram 6 1 CS F24DTE5 CS F28DTE5 CS F34DTE5 CS F43DTE5 CS F50DTE5 6 2 CU J24DBE5 CU J28DBE5 ...
Страница 25: ...25 6 3 CU J34DBE5 6 4 CU J24DBE8 CU J28DBE8 6 5 CU J34DBE8 CU J43DBE8 CU J50DBE8 ...
Страница 26: ...26 7 Wiring Diagram 7 1 CS F24DTE5 CS F28DTE5 CS F34DTE5 CS F43DTE5 CS F50DTE5 ...
Страница 27: ...27 7 2 CU J24DBE5 CU J28DBE5 ...
Страница 28: ...28 7 3 CU J34DBE5 ...
Страница 29: ...29 7 4 CU J24DBE8 CU J28DBE8 ...
Страница 30: ...30 7 5 CU J34DBE8 CU J43DBE8 CU J50DBE8 ...
Страница 32: ...32 8 2 Remote Control Display ...
Страница 33: ...33 8 3 Remote Control Panel ...
Страница 115: ...115 13 3 Reaching distance Cooling Mode CS F24DTE5 CS F28DTE5 CS F34DTE5 CS F43DTE5 CS F50DTE5 ...
Страница 116: ...116 13 4 Sound data ...
Страница 117: ...117 ...
Страница 118: ...118 ...
Страница 119: ...119 ...
Страница 120: ...120 ...
Страница 121: ...121 13 5 Sound measuring point 13 5 1 Indoor Unit 13 5 2 Outdoor Unit ...
Страница 125: ...125 13 7 Discharge and suction pressure SATURATION TEMPERATURE OF DISCHARGE AND SUCTION PRESSURE COOLING ...
Страница 127: ...127 14 Exploded View Indoor Unit 14 1 CS F24DTE5 CS F28DTE5 ...
Страница 128: ...128 14 2 CS F24DTE5 CS F28DTE5 ...
Страница 129: ...129 14 3 CS F24DTE5 CS F28DTE5 ...
Страница 132: ...132 16 Exploded View Indoor Unit 16 1 CS F34DTE5 CS F43DTE5 CS F50DTE5 ...
Страница 133: ...133 16 2 CS F34DTE5 CS F43DTE5 CS F50DTE5 ...
Страница 134: ...134 16 3 CS F34DTE5 CS F43DTE5 CS F50DTE5 ...
Страница 137: ...137 18 Exploded View Outdoor Unit 18 1 CU J24DBE5 CU J24DBE8 CU J28DBE5 CU J28DBE8 ...
Страница 138: ...138 18 2 CU J24DBE5 CU J24DBE8 CU J28DBE5 CU J28DBE8 ...
Страница 140: ...140 20 Exploded View Outdoor Unit 20 1 CU J34DBE5 CU J34DBE8 CU J43DBE8 CU J50DBE8 ...
Страница 141: ...141 20 2 CU J34DBE5 CU J34DBE8 CU J43DBE8 CU J50DBE8 ...
Страница 142: ...142 20 3 CU J34DBE5 CU J34DBE8 CU J43DBE8 CU J50DBE8 ...
Страница 144: ...144 22 Print Pattern 22 1 Indoor Unit Printed Main ...
Страница 145: ...145 22 2 Indoor Unit Printed Indicator 22 2 1 Outdoor Unit Main PHAAM Printed in Malaysia SSBZ0603 02 ...