
- Ensure the color of wires of outdoor unit and the terminal
Nos. are the same to the Indoor’s respectively.
- Earth lead wire shall be longer than the other lead wires as
shown in the figure for the electrical safety in case of the
slipping out of the cord from the anchorage. /
- Secure the cable onto the control board with the holder
(clamper).
52
Содержание CS-A123KR
Страница 13: ...13 ...
Страница 14: ...5 Refrigeration Cycle Diagram 14 ...
Страница 15: ...6 Block Diagram 15 ...
Страница 16: ...7 Wiring Diagram 16 ...
Страница 17: ...REMARKS B BLUE BR BROWN BL BLACK W WHITE R RED O ORANGE P PINK Y G YELLOW GREEN 17 ...
Страница 29: ...29 ...
Страница 32: ...Overload Deicing Time Diagram 32 ...
Страница 49: ...3 For the embedded piping 49 ...
Страница 50: ... This can be used for left rear piping and left bottom piping also 50 ...
Страница 75: ...75 ...
Страница 78: ...78 ...
Страница 79: ...79 ...
Страница 80: ...15 Exploded View 80 ...
Страница 89: ...How to use electronic circuit diagram 89 ...
Страница 90: ...TIMER TABLE 90 ...
Страница 92: ...22 2 PRINT PATTERN INDOOR UNIT PRINTED CIRCUIT BOARD TOP VIEW 92 ...
Страница 93: ...22 3 PRINT PATTERN INDOOR UNIT PRINTED CIRCUIT BOARD BOTTOM VIEW 93 ...
Страница 94: ... MACC Printed in Malaysia 94 ...