Step 3: Push the trays out.
10.3.4. Assembly of UD Base Unit
Step 1: Push the catch and slide the UD cam R guide as arrows
shown.
Step 2: Slot the UD base unit into the grooves.
Step 3: Ensure the change arm slot onto the groove then place
down the UD base unit into the open grooves.
Step 4: Slide the UD cam R guide as arrow shown to lock in the
UD base unit.
Step 5: Turn over the set and fix the FFC wires by using the
57
CR14C
Содержание CR14C
Страница 2: ...1 Mechanism Overview 2 CR14C ...
Страница 7: ...7 CR14C ...
Страница 11: ...This section is not available at the time of issue 7 Mechanism Operations Description 11 CR14C ...
Страница 13: ...8 2 Jig s Flow Diagram 13 CR14C ...
Страница 14: ...8 2 1 Flow operation 14 CR14C ...
Страница 15: ...15 CR14C ...
Страница 41: ... Disassembly of Load Plate Step 25 Position load plate as picture shown to remove it 41 CR14C ...
Страница 58: ...adhesive tapes Step 6 Push in the trays Step 7 Install tray lock lever Step 8 Install OC assy 58 CR14C ...
Страница 60: ...60 CR14C ...
Страница 62: ...CR14C 62 ...
Страница 66: ...CR14C 66 ...
Страница 67: ...15 Exploded Views 15 1 Cabinet Parts Location and Grease Drysurf Location CR14C 67 ...
Страница 68: ...CR14C 68 ...