Step 2: Ensure all catches are hooked to the Mecha P.C.B. and
Sensor P.C.B. then fix 2 screws.
•
Assembly of Open Switch Lever
Step 3: Install open SW lever.
•
Assembly of All Trigger Lever
Step 4: Ensure all trigger lever’s boss seated properly onto the
groove.
Step 5: Ensure the “U” shape of the all trigger lever snap to the
boss.
49
CR14C
Содержание CR14C
Страница 2: ...1 Mechanism Overview 2 CR14C ...
Страница 7: ...7 CR14C ...
Страница 11: ...This section is not available at the time of issue 7 Mechanism Operations Description 11 CR14C ...
Страница 13: ...8 2 Jig s Flow Diagram 13 CR14C ...
Страница 14: ...8 2 1 Flow operation 14 CR14C ...
Страница 15: ...15 CR14C ...
Страница 41: ... Disassembly of Load Plate Step 25 Position load plate as picture shown to remove it 41 CR14C ...
Страница 58: ...adhesive tapes Step 6 Push in the trays Step 7 Install tray lock lever Step 8 Install OC assy 58 CR14C ...
Страница 60: ...60 CR14C ...
Страница 62: ...CR14C 62 ...
Страница 66: ...CR14C 66 ...
Страница 67: ...15 Exploded Views 15 1 Cabinet Parts Location and Grease Drysurf Location CR14C 67 ...
Страница 68: ...CR14C 68 ...