8.12. Ionizer Operation
•
The Ionizer operation is to provide fresh air effect to user by producing minus ion in discharge air.
8.12.1. Operation Control
1. Ionizer individual operation
a. When air-conditioner unit is at “OFF” condition (standby) and ION operation button at the remote control is pressed, the
Ionizer and indoor fan operations will turn on. Only ION LED will illuminates. Power LED maintain off. (1
→
2)
b. Ionizer individual operation can be turned off by pressing the ION button again. (2
→
1)
c. Fan speed can be adjusted later by customer during this operation.
d. Vertical airflow direction can be adjusted using remote control during Ionizer individual operation.
e. During Ionizer individual operation, operated mode (Auto, Cool, Dry, Heat) can be activated by turning on the OFF/ON
operation button. (2
→
4)
f.
If power failure occur during Ionizer individual operation, after power resume, Ionizer operation will be activated immediately.
g. When the Ionizer circuit feedback process error occur for 24 times (about 11hr 30 min.), Ionizer and Air Circulation
operations will turn off with ION LED blinks continuously.
(For details, please refer to Ionizer Error detection control)
2. Operation mode & Ionizer operation.
a. When air-conditioner unit is at “ON” condition and ION operation button at the remote control is pressed, the Ionizer
operation will turn on. ION & Power LED will illuminate. (3
→
4)
b. Ionizer operation stops when:
•
ION operation button is press again.
•
Stopped by OFF/ON operation button.
•
Timer OFF activates.
•
Ionizer circuit feedback signal shows error.
c. Ionizer operation status is not memorized when the air conditioner has been switched off. The air-conditioner will operate
without ionizer operation when it is turned on again. However, if power failure occurs during Ionizer operation together with
Cooling operation, air-conditioner will start to operate at Cooling operation with Ionizer operation when the power is
resumed.
35
CS-A9DKA CU-A9DKA / CS-A12DKA CU-A12DKA /
Содержание C
Страница 3: ...2 Functions 2 1 Remote Control 3 CS A9DKA CU A9DKA CS A12DKA CU A12DKA ...
Страница 5: ...2 3 Outdoor Unit 5 CS A9DKA CU A9DKA CS A12DKA CU A12DKA ...
Страница 10: ...4 Dimensions 4 1 Indoor Unit Remote Control 10 CS A9DKA CU A9DKA CS A12DKA CU A12DKA ...
Страница 11: ...4 2 Outdoor Unit 4 2 1 CU A9DKA 4 2 2 CU A12DKA 11 CS A9DKA CU A9DKA CS A12DKA CU A12DKA ...
Страница 12: ...5 Refrigeration Cycle Diagram 12 CS A9DKA CU A9DKA CS A12DKA CU A12DKA ...
Страница 13: ...6 Block Diagram 13 CS A9DKA CU A9DKA CS A12DKA CU A12DKA ...
Страница 14: ...14 CS A9DKA CU A9DKA CS A12DKA CU A12DKA ...
Страница 15: ...7 Wiring Diagram 15 CS A9DKA CU A9DKA CS A12DKA CU A12DKA ...
Страница 16: ...16 CS A9DKA CU A9DKA CS A12DKA CU A12DKA ...
Страница 27: ...Normal Deicing Time Diagram Overload Deicing Time Diagram 27 CS A9DKA CU A9DKA CS A12DKA CU A12DKA ...
Страница 37: ...9 Operating Instructions 37 CS A9DKA CU A9DKA CS A12DKA CU A12DKA ...
Страница 38: ...38 CS A9DKA CU A9DKA CS A12DKA CU A12DKA ...
Страница 39: ...39 CS A9DKA CU A9DKA CS A12DKA CU A12DKA ...
Страница 40: ...40 CS A9DKA CU A9DKA CS A12DKA CU A12DKA ...
Страница 41: ...41 CS A9DKA CU A9DKA CS A12DKA CU A12DKA ...
Страница 42: ...42 CS A9DKA CU A9DKA CS A12DKA CU A12DKA ...
Страница 67: ...14 2 Operation Characteristics 14 2 1 CS A9DKA CU A9DKA 67 CS A9DKA CU A9DKA CS A12DKA CU A12DKA ...
Страница 68: ...14 2 2 CS A12DKA CU A12DKA 68 CS A9DKA CU A9DKA CS A12DKA CU A12DKA ...
Страница 79: ...79 CS A9DKA CU A9DKA CS A12DKA CU A12DKA ...
Страница 81: ...19 2 Remote Control 81 CS A9DKA CU A9DKA CS A12DKA CU A12DKA ...
Страница 82: ...19 3 Print Pattern Indoor Unit Printed Circuit Board BOTTOM VIEW 82 CS A9DKA CU A9DKA CS A12DKA CU A12DKA ...
Страница 83: ...TOP VIEW 83 CS A9DKA CU A9DKA CS A12DKA CU A12DKA ...