19
Diaphragm
If P5 is equipped with I/P unit (EP5), the I/P unit must be removed to access the diaphragm.
When installing the diaphragm make sure to place one washer on each side of the diaphragm.
Put some Loctite 577 on the thread, install the screw 3 and tighten.
Make sure the diaphragm is centered.
Check the O-ring for the diaphragm cover 2, install the O-ring into the positioner housing,
then install cover 2. Secure crosswise with screws 1, first turn loosely. Torque shall be 4,5
Nm (40 in-lbs).
Содержание PMV P4
Страница 1: ...IOM Instructions P4 P5 EP5 alve Control System...
Страница 11: ...11 X Port plugged C1 C2 S C1 C2 S C1 C2 S I I I Direct function...
Страница 27: ...27 Dimensional drawing P4...
Страница 28: ...28 17 Spare parts 21 20 3 21 20 20 15 18 21 1 6 16 20 20 10 17 13 19 20 2 20 11 20 21 12 20 7 8 9 P4...
Страница 30: ...30 Spare parts P5 EP5 84...
Страница 32: ...32 84 Spare parts P5 EP5...
Страница 34: ...34 18 Certificates Cenelec Atex black label...
Страница 35: ...35 Cenelec Atex black label...
Страница 36: ...36...
Страница 37: ...37 Cenelec Atex white label...
Страница 39: ...FM White label...
Страница 40: ...CSA White label...
Страница 41: ......