17
12. How to mount the I/P Unit to
the positioner unit (P5/EP5)
Switch off supply air and disconnect input signal – port I.
Loosen screws 3 and remove connection block 1, the gauge or plug from port Ip, the fitting
from port I and existing gasket 4. Carefully install gasket 6 supplied together with I/P unit.
When correct installed port I will be blocked by the gasket.
Make sure that relief valve spring 5 is installed properly. Install the connection block 1 to
the positioner unit 2.
Remove cover on I/P unit.
Install the I/P unit to the top of the Positioner unit, making sure that the four O-rings are
present and properly seated. Tighten the unit with the three screws. (See fig. 1 and 2 page
16) Screw 1 first, screw 2 last.
WARNING! Units installed in hazardous areas must have proper approvals.
Connect input signal cable to port I
E
and tighten the cable gland (see fig 5 on page 16).
Adjust the O-ring on the I/P Unit housing to desired posi-tion - sealed or drained. (See fig 3
on page 16 or section 9 on page 14).
A gauge indicating output signal from the I/P converter can be installed in port P. Make sure
that the filter plug is tightened before supply air is switched on (Fig 4 on page 16).
2
4
5
1
3
6
Содержание PMV P4
Страница 1: ...IOM Instructions P4 P5 EP5 alve Control System...
Страница 11: ...11 X Port plugged C1 C2 S C1 C2 S C1 C2 S I I I Direct function...
Страница 27: ...27 Dimensional drawing P4...
Страница 28: ...28 17 Spare parts 21 20 3 21 20 20 15 18 21 1 6 16 20 20 10 17 13 19 20 2 20 11 20 21 12 20 7 8 9 P4...
Страница 30: ...30 Spare parts P5 EP5 84...
Страница 32: ...32 84 Spare parts P5 EP5...
Страница 34: ...34 18 Certificates Cenelec Atex black label...
Страница 35: ...35 Cenelec Atex black label...
Страница 36: ...36...
Страница 37: ...37 Cenelec Atex white label...
Страница 39: ...FM White label...
Страница 40: ...CSA White label...
Страница 41: ......