19
Fix with 4 M8x25 mm round head bolts from 3 sides.
While placing the panels start front panel. First panel has a gasket for perfect insulation.
4.2. Panel Installation
Start place from front panel
Start place from front panel
The front panel has a gasket for perfect insulation
The front panel has a gasket for perfect insulation
Содержание Skyroof Plus
Страница 1: ...1 Installation Manual Skyroof Plus...
Страница 5: ...5 2 TERMINOLOGY...
Страница 22: ...22 Place rear covering to rear integrated gutter...
Страница 26: ...26 4 4 Back covering for wall installation Place the back covering profile Z bended...
Страница 31: ...31 4 8 Corner Cap Place the Corner Cap on the top of the integrated gutter s joint point...
Страница 35: ...35...
Страница 55: ...55...
Страница 56: ...56 www palmiye eu...