background image

7

3.2.2. Panel

BOM ID 

Description

Qty

1

Power Pin

2

2

Side Cover Cap

2

3

Side Cover Cap Screw

4

4

Fixed Pin

2

5

Panel Profile For Skyroof Compact Series

1

6

Top Gasket

1

3.2.3. Pillars

BOM ID 

Description

Qty

1

Water Output 70mm

1

2

250x250x10mm Aluminum Flange

1

3

120x120x3mm Aluminum Pillar

1

Содержание Skyroof Compact

Страница 1: ...1 Installation Manual Skyroof Compact ...

Страница 2: ...and exact installation of our product We recommend you to read our instruction carefully During installation all necessary actions have to be carried out by authorized and specialized technicians All unauthorized interventions during warranty period will invalidate the warranty ...

Страница 3: ... 40 33 46 47 1 Symbols Precautions and Warnings 2 Terminology 3 Packaging 4 Installation Steps 6 Sensors and Automation 7 Hardware 8 Tools 9 Frequently Asked Questions 10 Risk Table 5 Programming Resetting of Panels and Lights ...

Страница 4: ... people or animals or property It is forbidden to tamper to bioclimatic pergola system General Precautions Before starting of any assembly maintenance or cleaning operations make sure that you have fully understood the indications in this manual All electrical connections for Skyroof Compact must be made by qualified personnel In case of any incompatibility call Palmiye General Safety Precautions ...

Страница 5: ...linear actuator The control box works with 120V or 230V 50 60Hz Linear Actuators provide the movement of bioclimatic pergolas Linear Actuators are located on lateral Integrated Gutter Also linear actuators have to be adjusted to exact movement Therefore linear actuator movement settings must be done during to installation ...

Страница 6: ...ks On receipt of the packed goods and before starting their assembly check the integrity of the material and the presence of all the components necessary for the installation In case of anomalies immediately stop the work and contact with hospital Fixing elements such as screws plugs etc are included in the box If not please contact service department of Palmiye Do not use a knife to avoid the ris...

Страница 7: ...Pin 2 2 Side Cover Cap 2 3 Side Cover Cap Screw 4 4 Fixed Pin 2 5 Panel Profile For Skyroof Compact Series 1 6 Top Gasket 1 3 2 3 Pillars BOM ID Description Qty 1 Water Output 70mm 1 2 250x250x10mm Aluminum Flange 1 3 120x120x3mm Aluminum Pillar 1 ...

Страница 8: ...ounting brackets Pillar caps It has a blue label on the box 3 Plastic Box Corner Plastics ELECTRIC METAL PLASTIC 3 2 4 Boxes 1 Electrical Box Remote Controls Sensors Automations are on Electric box It has a red label on the box ...

Страница 9: ...ated product step 4 1 1 Wall installation move to step 4 1 1 4 1 2 Ceiling installation move to step 4 1 2 4 1 3 Free standing move to step 4 1 3 4 1 1 Wall installation With the help of laser all hole locations should be marked at the same level and holes should be drilled with Ø16 mm drill The bracket must away 35cm 1 2 from the corner Brackets should be fixed for every 150cm 5ft 35cm 1ft 150cm ...

Страница 10: ...10 Fasten of the M12 steel rod to the wall and tighten of rods Place the Integrated gutter to the wall mounting bracket ...

Страница 11: ...l mounting bracket Important All screwing should be discarded after product size control The Final view 4 1 2 Ceiling installation Define to ceiling mounting bracket position on the ceiling and make a hole with Ø16mm drill Ceiling Mounting Bracket 35cm 1ft Product Width Ceiling Ceiling Mounting Bracket 35cm 1ft Product Width Ceiling ...

Страница 12: ... Integrated gutter to the ceiling mounting bracket M20x50mm screw Ceiling Mounting Bracket M20 Nut M20 Steel Rod Washer for M20 Screw Rear Integrated Gutter M20x50mm screw Ceiling Mounting Bracket M20 Nut M20 Steel Rod Washer for M20 Screw Rear Integrated Gutter The final view ...

Страница 13: ... Nut as you see in below figure Washer M8 Stainless Steel Washer M6 Stainless Steel Sealed Nut M8 Stainless Steel Sealed Nut M6 Stainless Steel Washer M8 Stainless Steel Washer M6 Stainless Steel Sealed Nut M8 Stainless Steel Sealed Nut M6 Stainless Steel Sealant Sealant Lift up a rear frame Don t work alone You may need someone else Sealant Sealant ...

Страница 14: ...Side Lateral Integrated Gutter Rear Integrated Gutter Left Side Lateral Integrated Gutter Linear Actuator placed on the back side on lateral integrated gutter which is shown at below figure The Linear Actuator have located on rear of the gutter The Linear Actuator have located on rear of the gutter The fixing Lateral side integrated gutter to rear integrated gutter with M10 Sealed Nut ...

Страница 15: ...15 4 1 4 Cross Check and Level Control 4 1 5 Pillar Fixing 4 1 5 1 Stainless Steel Anchorage First of all define to exact pillar position and mark it ...

Страница 16: ...ace the stainless steel anchorage to marked location For flange installation please refer to freestanding model Place the cap Apply a sealant then place the pillar into the anchorage At the end fix by M4 8x25mm self tapping screw ...

Страница 17: ... 4 M12 and chemical dowels Then put the washers and nuts on the rods from inside and tighten them Put the inner cover and apply sealant to the sides Sealant Sealant Fix with 4 M8x25 mm round head bolts from 3 sides Place the front cover and fix it with 4 M8x25 mm round head bolts Place the pillar on the anchorage ...

Страница 18: ...gutter profile 4 2 Panel Installation Place the middle panels to escalloped lateral side integrated gutter which is shown at below figure The last 3 panel pins are shorter than middle panel s because of the reason is that prevent the pins from striking the linear actuator The last 3 panel pins are shorter The middle panel pins are longer The last 3 panel pins are shorter The middle panel pins are ...

Страница 19: ...19 In order to protect to remove the panels should use to 1 5mm sheet 4 3 Control box installation Control box can be located on rear integrated gutter ...

Страница 20: ...tuator connecting 40x20mm Aluminium profile must be connect to the panels This profile allows the movement of the actuators to pass through the panels Pin house direction should be from outside to inside as you see at below ...

Страница 21: ...lease check programming 3 To allign holes of 40x20 profile and actuator profile move actuators front or back by remote control 4 Fix bolts of profile to eachother Fasten Snap Ring to the panel pins Fasten Snap Ring to the panel pins 4 5 Linear Actuator Connector 40x20mm Profile connection M12x50mm hexagonal bolt stainless steel M10 Washer Stainless Steel M12 washer Stainless steel M12x35mm hexagon...

Страница 22: ...4 module connection If there is a 2 module or 4 module these modules are not welded to the pillar That brackets and pillars will be sent separately 4 6 1 2 Module and pillar connection 4 6 2 4 Module and Pillar connection ...

Страница 23: ...file Cap to related house on perimeter lighting profile Perimeter lighting profile should be located on 6mm top of the integrated gutter Place perimeter lighting profile to the integrated gutter Place corner plastic between perimeter lighting profile on the corner side ...

Страница 24: ...s at the back of control box Black cable is for RGB Led Lighting which has water proof socket Open socket from middle you will find marks Terminal 1 2 PE and N on that One side of socket has marks other side has cable connection Fix cables according to instructions on control board ...

Страница 25: ...op of the integrated gutter s joint point 4 9 Back covering for wall installation Place the back covering profile Z bended Then fix by M4 2x19mm self tapping screw Then apply a sealant between wall and back covering Z Bended profile Sealant Sealant ...

Страница 26: ...ntly should be provided Power only needs to be supplied to the Control Unit Box The receiver is completely enclosed inside the Control Unit Box PALMIYE Reserves the right to void the motor warranty if wiring recommendations are not followed The Control Box works 120 or 230 V AC 50 60 Hz Installation Requirements If the installation is made up of several RTS system only one RTS system must be power...

Страница 27: ...fferent remote control models Pure Patio Lounge Modulis Situo 1 RTS has only one channel It means it can control 1 RTS motor Situo 5 RTS has 5 channels It means it can control 5 different RTS motor Telis 16 has 16 channels It means it can control 16 different RTS motor UP STOP DOWN LED Indicator Light Single Channel Version UP STOP DOWN LED Light Channel Selector Five Channel Version Back Pen Five...

Страница 28: ...eight 145 151 Colour Silver Silver Pure Compatibility Compatible with a range of Somfy RTS enabled products Radio Frequence For indoor use Radio Range 433 42 MHz Protection Index 200m in open field or 20m through 2 reinforced concrete walls Working tempera ture IP30 Information 0C to 60C Installation Wall brackets supplied 5 3 Remote Types ...

Страница 29: ...29 ...

Страница 30: ...Perimeter and or Panel lights Step 1 Select desired channel on your remote Step 2 Press UP and DOWN button simultaneously Both lighting system wil TURN ON Step 3 Press PROG button on your remote control IMPORTANT NOTE At this stage if there is only one of these systems the lighting programming process is completed However if there is both perimeter and panel lighting both lighting systems are prog...

Страница 31: ... again after waiting Step 4 2 Select desired channel on your remote control Step 4 3 Press UP and DOWN button simultaneously Step 4 4 Press PROG button on your remote control Thus the programming of lights will be done 5 5 3 RGB Led Programming Press the programming button on the panel for 5 seconds then press the programming button on the back of the remote for 2 seconds 5 6 Motor Calibration The...

Страница 32: ... adjust to favorite light intensity automatically 5 8 2 Using of motors UP button Opens the panels DOWN button Closes the panels MY button It stops the motor from running and ensures that the panels remain where they are 5 8 3 Transfer the channel on the current remote control to a different remote control Step 1 On the current remote select which channel you want to transfer Step 2 On the current...

Страница 33: ...al motors Enter the learning mode Press more than 2 seconds on the programming button of a RTS control which is already memorized in the motor Press briefly on the prog button of the EOLIS RTS Sensor The awning moves shortly DOWN UP Record or delete a sensor Press briefly on the prog button of the EOLIS sensor RTS The awning moves shortly DOWN UP Erase all the sensors and record a new one Press mo...

Страница 34: ...motor must be in programming mode to record a SOLIRIS RTS Sensor One SOLIRIS RTS Sensor can be memorized into several motors It isn t recommended to memorize more than 1 SOLIRIS RTS Sensor into motor s memory To Enter the Programming mode Activate the receiver s memory by pushing for more than 2 seconds the programming button of a transmitter already recorded in the motor s memory To Record or del...

Страница 35: ... of sensor press briefly the Mode button if LED lights ready for use FEATURES Up to 3 sensors can be memorized in one motor it could be combined with other RTS sensors EOLIS RTS SOLIRIS RTS One Sunis sensor RTS can be memorized in several motors Supply SOLAR Autonomy 24 hours without new daylight intensity PROGRAMMATION To proceed to programming sensor must be charged refer to important remarks be...

Страница 36: ... support SUN FUNCTIONNING Use the Telis with sun function to activate or deactivate the sun function Telis Soliris RTS Telis Modulis Soliris RTS Manual Mode Sun function deactivated Automatic mode Sun function activated Sun appearing When the intensity of the daylight exceeds the threshold set by the Sunis sensor RTS a Down order is sent to the blind after 2 mins The blind goes to the MY position ...

Страница 37: ...EIS Rain sensor has a two cable output One cable must go to main voltage 230V 50Hz and other is to dry contact signal cable You must joint rain sensor dry contact cable to RS485 s channel input jacks from 1 to 5 In this case there is only one solution if your products have more than 2 rails you can upgrade to tandem motor system Otherwise there is no solution When you plug all cables now you can p...

Страница 38: ... pin code which is below of the Connexoon transmitter Read and Skip information tabs Click 3 line on left top Click configuration Click add button Select your product Program to your product Give a name to your product Now you can control by your smart phone 6 2 2 Adaptable To Other Automation Systems In order to connect to different automation home smart system there is RS485 RTSTransmitter or Dr...

Страница 39: ...5 RTS transmitter or Dry contact Transmitter until the motor jogs The product is assigned to the transmitter It can up to 16 groups of Somfy RTS motors and receivers Press the programming button on the back of the RTS control point or the RTS receiver until the motor jogs The product is in programming mode Send by the RS485 control or Dry Contact Transmitter the corresponding RTS frame on the desi...

Страница 40: ...8 Stainless Steel Integrated Gutter for Compact Series Sealed Nut M8 Stainless Steel Washer M6 Nut M6 120x120x3mm Pillar Washer M8 Stainless Steel Integrated Gutter for Compact Series Sealed Nut M8 Stainless Steel Washer M6 Nut M6 120x120x3mm Pillar M12 Steel rod M4 8x25mm self drilling screw M8x25mm Bolt Wall Mounting Bracket Rear Integrated Gutter M12 Steel rod M4 8x25mm self drilling screw M8x2...

Страница 41: ...er for M20 bolt 7 4 Linear Actuator Linear Actuator Connector 16mm Snap ring M20x50mm bolt M20 Steel rod M20 nut M20 washer Ceiling bracket M20x50mm bolt M20 Steel rod M20 nut M20 washer Ceiling bracket Fasten 16mm Segment to motor connector Fasten 16mm Segment to motor connector ...

Страница 42: ... C0018 KAHV Sealant NP1 Light Brown to block the passage of water through the surface or joints or openings in materials HRD KMY C0018 AKAH Sealant Black to block the passage of water through the surface or joints or openings in materials HRD KMY G0016 SYAH Sealant White to block the passage of water through the surface or joints or openings in materials HRD KMY G0017 BYAZ Sealant Grey to block th...

Страница 43: ...T G1062 PSMZ M12 Washer Stainless Steel part to to fix and stabilaze products to ground wall ceiling HRD PUL G0003 PSMZ M30 Washer Galvanized part to to fix and stabilaze products to ground wall ceiling HRD PUwG0014 ZINC M12 Acorn Nut part to to fix and stabilaze products to ground wall ceiling HRD SMN G0008 ZINC M12 Nut Stainless Steel part to to fix and stabilaze products to ground wall ceiling ...

Страница 44: ...Spiral grinder 1 pc Batery driller 1 pc Electric impact drill 1 pc Lighting 2 pc Extansion lead 2 pc Ladder 2 pc Tape measure 5m 1 pc Tape measure 10m 1 pc Water gauge 2 pc Laser Meter 1 pc 35 cm angle 1 pc Wrench Set 2 Set Flush Cutter 2 pc Pliers 2 pc ...

Страница 45: ...1 Set Plastic hammer 1 pc Iron hammer 2 pc Electrical screw driver 2 pc Cutter 1 pc Slicon gun 2 pc Bits 2 Set PH2X100 Bits 2 pc APEX 493 A Bits 2 pc Insulating Tape Black 6 pc Insulating Tape White 6 pc Glue 2 pc Punch driller 70 mm 2 pc Guide drill bit 1 set ...

Страница 46: ... should be checked if the product is energized The power must be discon nected and connected again Please call our technical service if nothing changes at lights Part of the lights is not on Please call our technical service The remote controller does not work It does not control the product The battery should be replaced Please call our technical service if it still does not work Lights are not o...

Страница 47: ...hared by all of our employees Our efforts aimed at offering its customers products they can use for many years with great satisfaction has turned Palmiye into one of the leading brands in national and international market Palmiye is the sector leader in terms of adopting and applying ISO 9001 2008 standards As an outcome of the meticulous studies conducted by the R D department all of our products...

Страница 48: ...48 www palmiye eu ...

Отзывы: