
13
Front beam and front pillar connection bolts should be fastened on the ground after lifted as
shown image below.
In this situation you may need some people since you must hold pillars carefully.
M12x185 Countersunk Bolt
M12x185 Countersunk Bolt
In this stage of installation , front pillars do not need to be their exact points. Exact points of
front pillars is determined after 4.1.6.
Содержание SILVER PLUS
Страница 1: ...1 Installation Manual Silver Plus Freestanding...
Страница 20: ...20 4 1 5 Cross Check and Level Control...
Страница 52: ...52...
Страница 83: ...83 10 RISK TABLE...
Страница 86: ...86 www palmiye eu...