M
A
IN
T
E
N
A
N
C
E
/
R
E
P
A
IR
T
R
O
U
B
L
E
S
H
O
O
T
IN
G
O
P
E
R
A
T
IO
N
A
S
S
E
M
B
L
Y
/
I
N
S
T
A
L
L
A
T
IO
N
S
A
F
E
T
Y
/
S
P
E
C
IF
IC
A
T
IO
N
S
G
E
T
T
IN
G
S
T
A
R
T
E
D
14
MAINTENANCE/REPAIR
Replacement of gear box oil
Place a container, labeled to indicate the contents for the
purposes of disposal, beneath cap 22. Remove caps 95 and 22
(see “Parts List” on page 15), and let the used oil drain into
the container. Replace cap 22. Pour 1 gal (0.2 liter) of oil (see
“Lubrication” on page 8) into the oil feed hole located on the
upper part of the gear box and then replace cap 95.
Lubrication of mobile parts of piece locking vise
Remove the vise (21) completely by turning hand wheel 11 (see
“Parts List” on page 15). Clean and grease the parts worked
by the counter-vise 75, the vise 21 and the vise gib 101. Put a
drop of oil in the oil feed hole 19 located behind the handwheel.
Then install the vise.
Cleaning of the coolant tank : Filter check.
The coolant tank can be cleaned by simply removing the crucible
87 (see “Parts List” on page 15). Empty the coolant from the
tank and collect the coolant in a container for future disposal.
Clean away the shavings and the metallic powder , taking care
not to scatter this over the machine especially around the motor
and the box containing the electrical equipment.
Fill the tank with 0.75 gal (3 liter) of coolant liquid:
water and 5-7% AGIP AQUAMET 700 EP oil.
Checking of bench lever functioning
Check regularly that the rotation release - locking lever is working
properly. If the lever does not lock correctly, loosen grub screw 91
(see “Parts List” on page 15), tighten nut 90 and tighten grub
screw 91 again. Make sure that with the bench lever in position 2,
arm 4 supporting the blade motor block can rotate freely.
Suggested Maintenance Schedule
FREQUENCY (working hours)
OPERATION
1000 hrs or monthly
Replace the oil in the gear box with AGIP BLASIA 220 oil (0.2 liter) or equivalent.
1000 hrs or monthly
Lubricate mobile parts in the piece locking vise.
50 hrs or every 2 days
Clean coolant tank and check filter.
Wiring
Содержание 9683338
Страница 1: ...Operating Instructions Parts Manual 14 5 Vertical Column Cold Saw 9683338 9644664 01...
Страница 16: ...MAINTENANCE REPAIR TROUBLESHOOTING OPERATION ASSEMBLY INSTALLATION SAFETY SPECIFICATIONS GETTING STARTED 16...
Страница 17: ...GETTING STARTED SAFETY SPECIFICATIONS ASSEMBLY INSTALLATION OPERATION TROUBLESHOOTING MAINTENANCE REPAIR 17...
Страница 18: ...MAINTENANCE REPAIR TROUBLESHOOTING OPERATION ASSEMBLY INSTALLATION SAFETY SPECIFICATIONS GETTING STARTED 18...
Страница 19: ...GETTING STARTED SAFETY SPECIFICATIONS ASSEMBLY INSTALLATION OPERATION TROUBLESHOOTING MAINTENANCE REPAIR 19...
Страница 23: ...GETTING STARTED SAFETY SPECIFICATIONS ASSEMBLY INSTALLATION OPERATION TROUBLESHOOTING MAINTENANCE REPAIR 23...