A300400 4-Person Temporary Horizontal Lifeline

 

     User Instruction Manual

 

 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

For the purposes of this manual, the PALMER SAFETY 4-Person Temporary Horizontal Lifeline may be referred to as the PALMER SAFETY 4-Person  
Temporary HLL, the Horizontal Lifeline, HLL, the system, or the lifeline.

 

This manual is intended to meet the 

Manufacturer’s

 Instructions as required by the American National Standards 

Institute (ANSI) Z359 and should be used as part of an employee training program as required by the Occupational 

Safety and Health Administration (OSHA).

 

Содержание A300400

Страница 1: ...ferred to as the PALMER SAFETY 4 Person Temporary HLL the Horizontal Lifeline HLL the system or the lifeline This manual is intended to meet the Manufacturer s Instructions as required by the American...

Страница 2: ...rmediate anchor points is recommended to minimize the potential of the other workers falling IMPORTANT This product is part of a personal fall arrest restraint work positioning suspension or rescue sy...

Страница 3: ...ary in its performance depending upon the length of the system the number of workers attached and the type of PFAS being used Care should be taken to understand the capacity of the system minimum requ...

Страница 4: ...AFETY fall arrestor connecting subsystems 2 7 Clearance Requirements The PALMER SAFETY 4 Person Temporary HLL is designed to react to a fall event by elongating and deflecting to absorb energy PFAS at...

Страница 5: ...ser Capacity Each Max Two Workers 1 Find Span Length in Table Below 2 Find Freefall Distance in Table Below 3 Required Fall Clearance at the intersection of Span Length and Freefall Distance see table...

Страница 6: ...ent HLL systems for each person or shorter span lengths or intermediate anchor points is recommended to minimize the potential of the other workers falling Temporary HLL with EAL Minimum Required Fall...

Страница 7: ...bsystems only Substitutions or replacements made with non ANSI Z359 compliant components or subsystems may jeopardize compatibility of equipment and may affect the safety and reliability of the comple...

Страница 8: ...l Anchorage Connectors to be used when planning a PFAS Failure to inspect assemble install and or maintain Anchorage Connectors could result in injury or death 4 4 Connectors Deceleration Devices Conn...

Страница 9: ...tely 200 300 lbf The loose end tail length should not less than 3 3ft 1 0m Step 5 Once properly tensioned connect a PFAS system only to the connection O rings that have been preinstalled on the lifeli...

Страница 10: ...ifeline is properly tensioned Please review the inspection checklist for inspection requirements 2 Inspection Frequency Other than pre use inspection the PALMERSAFETY 4 Person Temporary HLL should be...

Страница 11: ...on results should be recorded by a competent person at least once ayear 5 Inspection Document Record inspection results on the inspection record provided below or similardocument 8 0 Labels The labels...

Страница 12: ...Inspection Record Model Serial Date ofManufacture INSPECTION DATE INSPECTOR COMMENTS PASS FAIL CORRECTIVE ACTION NEEDED APPROVED BY...

Страница 13: ...GENERAL WORK PRODUCTS LLC 6000 Je erson Hwy Harahan LA 70123...