background image

 

 

2.3

 

System Capacity: 

The PALMER SAFETY 4-Person Temporary HLL maximum capacity is four workers simultaneously, with each worker 

weighing no more than 310 lbs. inclusive of clothing, tools, etc. 

 

2.4

 

Anchorage Requirements: 

End anchors selected for use with this system must be a minimum of 5,000 lbs. (22.2 kN) for one and two 

workers.  If used in applications with leading edge hazards, anchorage locations must be selected so that the deflected HLL shall not 
come in contact with a leading edge in the event of a fall. 

 

2.5

 

Total Allowable Free Fall: 

OSHA limits free fall to 

6’

 or less. The HLL system described in this manual is designed to be used overhead and 

free fall should be limited to 6’ 

only. 

 

2.6

 

PFAS Selection: 

Only PALMER SAFETY PFASs may be used in conjunction with this HLL system. The HLL may be used with 

PALMER SAFETY energy absorbing lanyards those are ANSI Z359.13 complies and PALMER SAFETY fall arrestor connecting 
subsystems. 

 

2.7

 

Clearance Requirements: 

The PALMER SAFETY 4-Person Temporary HLL is designed to react to a fall event by elongating and deflecting 

to absorb energy. PFAS attached to the HLL will also elongate during a fall event. Failure to calculate the fall clearance required when 
using the system could result in contact with a lower level or obstruction during a fall event and could result in serious injury or death. 
See tables and charts below for calculating minimum required fall clearance. 

2.7.1

 

Minimum Required Fall Clearance for One Worker w/EAL

 

 

Temporary HLL with EAL Minimum Required Fall Clearance

 

310 lbs. Maximum User Capacity

 

Max. One Worker

 

1

 

Find Span Length in Table Below

 

2

 

Find Freefall Distance in Table Below

 

3

 

Required Fall Clearance at the intersection of Span Length and Freefall Distance (see table below)

 

A. 

Overhead Anchorage 

B. 

Walking/Working Surface 

C. 

Nearest Lower Level or Obstruction

 

* Work below HLL to avoid Swing Fall

 

 

Freefall Distance (feet)

 

 

Figure 3 - 4-Person Temporary HLL with EAL

 

Minimum Fall Clearance (One Worker)

 

1

 

A

 

2

 

B

 

3

 

C

 

Содержание A300400

Страница 1: ...ferred to as the PALMER SAFETY 4 Person Temporary HLL the Horizontal Lifeline HLL the system or the lifeline This manual is intended to meet the Manufacturer s Instructions as required by the American...

Страница 2: ...rmediate anchor points is recommended to minimize the potential of the other workers falling IMPORTANT This product is part of a personal fall arrest restraint work positioning suspension or rescue sy...

Страница 3: ...ary in its performance depending upon the length of the system the number of workers attached and the type of PFAS being used Care should be taken to understand the capacity of the system minimum requ...

Страница 4: ...AFETY fall arrestor connecting subsystems 2 7 Clearance Requirements The PALMER SAFETY 4 Person Temporary HLL is designed to react to a fall event by elongating and deflecting to absorb energy PFAS at...

Страница 5: ...ser Capacity Each Max Two Workers 1 Find Span Length in Table Below 2 Find Freefall Distance in Table Below 3 Required Fall Clearance at the intersection of Span Length and Freefall Distance see table...

Страница 6: ...ent HLL systems for each person or shorter span lengths or intermediate anchor points is recommended to minimize the potential of the other workers falling Temporary HLL with EAL Minimum Required Fall...

Страница 7: ...bsystems only Substitutions or replacements made with non ANSI Z359 compliant components or subsystems may jeopardize compatibility of equipment and may affect the safety and reliability of the comple...

Страница 8: ...l Anchorage Connectors to be used when planning a PFAS Failure to inspect assemble install and or maintain Anchorage Connectors could result in injury or death 4 4 Connectors Deceleration Devices Conn...

Страница 9: ...tely 200 300 lbf The loose end tail length should not less than 3 3ft 1 0m Step 5 Once properly tensioned connect a PFAS system only to the connection O rings that have been preinstalled on the lifeli...

Страница 10: ...ifeline is properly tensioned Please review the inspection checklist for inspection requirements 2 Inspection Frequency Other than pre use inspection the PALMERSAFETY 4 Person Temporary HLL should be...

Страница 11: ...on results should be recorded by a competent person at least once ayear 5 Inspection Document Record inspection results on the inspection record provided below or similardocument 8 0 Labels The labels...

Страница 12: ...Inspection Record Model Serial Date ofManufacture INSPECTION DATE INSPECTOR COMMENTS PASS FAIL CORRECTIVE ACTION NEEDED APPROVED BY...

Страница 13: ...GENERAL WORK PRODUCTS LLC 6000 Je erson Hwy Harahan LA 70123...

Отзывы: