background image

Installation manual 

 

 
 

 

Continue the installation of the walls by strongly forcing the wall logs into one another. If necessary, 
use the hitting block and hammer. At the same time, do not forget to begin the installation of the door 
and windows. You should definitely begin the door installation after the 5

th

-6

th

 layer of logs. 

Door and window 

Doorframe: 

 If it is a double door, the 

doorframe is supplied in 
separate parts due to 
transportation requirements and 
you will have to begin by 
assembling it.  

  To do this, place together the 4 

parts of the frame and screw 
them onto one another.  

  Make sure that the part of the 

frame with the deeper notch is 
installed upwards. The lateral 
jamb parts have hinges and are 
mirrored.  

  It is recommended to install the 

leaves later.  

  If it is a single door, its frame and 

leaf are supplied already 
assembled. 

 Doorframe installation (Only necessary for a double door!): 

 

 

Door installation: 

The doorframe is placed at the 
formed aperture and pushed with 
force onto the lower log. If it is a 
double door, place the leaves on the 
hinges now. To open and close the 
door, fit the separately packaged lock 
and handle.  

 

 

Window installation: 

Continue with the installation of the wall logs until you reach the window height. The wall plans (see 
Technical specifications) show how many logs go under the window. Install the window similarly with 
the door. Just like the door, push the window frame with the window into the window aperture onto the 
lower log, applying force. Make sure that the window is not fitted backwards (topsy-turvy).  

ADVICE

: Definitely make sure that the windows and doors open in the proper direction. The doors 

always open from the inside 

to the outside

. The revolving-tilting windows open 

to the inside

. The 

revolving and the slinging windows open 

to the outside

 (the window handles are on the inside). 

ATTENTION

: It is not necessary to fix the doors and windows to the wall logs! If you wish to do this, it 

will be sufficient to fix them with a couple of screws in the lower part of the frame because as they dry, 
the wall logs will begin subsiding.  

You can conduct the final adjustments of the doors and windows only some 2-3 weeks after the house 
installation, when the house will have become adapted to weather conditions and its logs settled.  

 

www.simplylogcabins.co.uk

Содержание FRG28-4032

Страница 1: ...ieures sont exclues Si une réclamation avait lieu veuillez respecter le déroulement suivant Il vous faudra présenter à votre commerçant spécialisé ce bulletin de contrôle avec le récépissé de l achat Ce ne sera que moyennant présentation de ces documents qu un traitement rapide et sans problème de votre réclamation sera possible Italiano La casetta che avete acquistato è stata prodotta secondo la ...

Страница 2: ...récépissé Data prova d acquisto Fecha recibo Kvitteringsdato Kasse bons dato Forwarder Pick up Others Door Verzending Zelf afhalen Spedition Selbstabholer Par Transporteur Propres moyens Tramite Spedizioniere Mezzo proprio Entrega Transporte organizado transporte propio Transportør Sendes Hentes Transportør Sendes Hentes Description of complaint Beschrijving van de klacht Schilderung der Beanstand...

Страница 3: ...oduktet Alle rechten en technische wijzigingen voorbehouden Installation manual Montageanleitung Notice de montage Istruzioni per il montaggio Manual de montaje Monteringsanvisning Installatiegids Log cabin FRG28 4032 ZL Art Nr 881392 Blockhaus Maisonnette en poutres Casa di travi Casa de jardin Anneks Tuinhuis Width 400 x Depth 320 cm Breite Tiefe Largeur Profondeur Lunghezza Profondita Ancho Pro...

Страница 4: ...ly review complaints if you submit the control number of the house to the seller The warranty does not cover Peculiarities of wood as a natural material Wooden details already painted processed with a wood preservative Wooden details containing whole branches that do not endanger the stability of the house Colour tone variations caused by wood structure differences that do not influence wood lifet...

Страница 5: ...mpregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusive finishing a weather protection paint that will protect wood from moisture and UV radiation When painting use high quality tools and paints follow the paint application manual and manufacturer s safety and usage instruc...

Страница 6: ... sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete or pavement slabs Cast concrete bed Prepare the foundation so that the foundation joists are propped up on every side with intervals not exceeding 50 60 cm Consult an expert in this field or have the foundation prepared ...

Страница 7: ... are not included in the supplied kit Installation of foundation joists Walls When installing the walls it is important to remember that The logs are always assembled with their tongue upwards If necessary use the hitting block and hammer Never directly hit the tongue with the hammer Install the walls in accordance with the appended wall plans see Technical specifications First of all place half l...

Страница 8: ...ow To open and close the door fit the separately packaged lock and handle Window installation Continue with the installation of the wall logs until you reach the window height The wall plans see Technical specifications show how many logs go under the window Install the window similarly with the door Just like the door push the window frame with the window into the window aperture onto the lower l...

Страница 9: ...idewall log somewhat lower Roof Before installing the roof boards make sure that the house is completely level Use the water level to check all walls ATTENTION When placing the roof use a stable ladder Do not step on the roof as the structure is suitable to sustain only an even load snow wind etc and not a point load Begin the installation of the roof boards from the front edge of the roof Tap the...

Страница 10: ...t nails at intervals of about 15 cm Make sure that the felt strips overlap by at least 10 cm Having installed the roof cover material attach the wind braces to the roof and the facia boards to the rafters and upper wall logs Installation of wind braces and facia boards Floor Only when the house is built completely you can install the floor boards thus avoiding unnecessary smudging on the floor Pla...

Страница 11: ...ends of the slats Do not turn the screws tightly so wood can further swell or diminish With the house having settled you should adjust the attachments so the wall logs can settle Installation of storm braces General advice Problem Gaps appear between the wall logs Cause Additional details are attached to the house that do not allow wood to swell diminish Solutions If the door window is attached to...

Страница 12: ...w w w s i m p l y l o g c a b i n s c o u k ...

Страница 13: ...w w w s i m p l y l o g c a b i n s c o u k ...

Страница 14: ...w w w s i m p l y l o g c a b i n s c o u k ...

Страница 15: ...w w w s i m p l y l o g c a b i n s c o u k ...

Страница 16: ...w w w s i m p l y l o g c a b i n s c o u k ...

Страница 17: ...w w w s i m p l y l o g c a b i n s c o u k ...

Страница 18: ...w w w s i m p l y l o g c a b i n s c o u k ...

Страница 19: ...w w w s i m p l y l o g c a b i n s c o u k ...

Страница 20: ...w w w s i m p l y l o g c a b i n s c o u k ...

Страница 21: ...w w w s i m p l y l o g c a b i n s c o u k ...

Отзывы: