Document #: 020-17475-00 Revision: E
Page #: 37 of 63
Figure 40
: LevMixer screen
Figure 41:
Place charger screen
Readiness of the unit for levitation is indicated by a blinking READY button on the screen
after completion of the power up process. Selecting this button brings the system to the
Main Menu screen where the user can choose the mode of operation to prepare for
mixing.
Figure 42
: Power up screen
Figure 43
: Charger selection screen
During the power up process the software will direct the operator to follow a prescribed
process until the power up is completed so that the superconductors are properly
charged.
One of three modes is possible when the unit is started:
1)
Superconductors are not charged. Charging is required. This happens when the unit
is powered off for 25 minutes or more. Operator must follow the Charging
Procedure as described in Section H.
Charging will start automatically after power is turned ON. The “PLACE CHARGER
IMMEDIATELY” notice will display on the touch screen (see Figure 41). By
acknowledging the user confirms that the charger is installed and the unit can
proceed to the power up screen. A blinking “charge in progress” will be displayed
in the window status bar and the elapsed charging time will be indicated in the
charging status row along with Information on the last power off date and time (see
Figure 42).
Содержание LevMixer DB-300
Страница 53: ...Document 020 17475 00 Revision E Page 53 of 63 Figure 62 Levmixer components bottom view ...
Страница 55: ...Document 020 17475 00 Revision E Page 55 of 63 Figure 64 Electrical Schematic Cage ...
Страница 62: ......
Страница 63: ......