www.pall.com/biopharm
16
8. Begin inflation by switching the
‘BAG INFLATION’ switch to ‘ON’.
Gas should now start to enter the
single-use mixer system
WARNING!
Operator should be in
attendance throughout
steps 8 - 13
9. As the system inflates the shaft
coupling will move towards the
bottom of the tote.
Align the shaft coupling, sample
line and outlet tubing with the
ports on the bottom of the tote
(see next picture).
10. As the system approaches full
inflation. STOP inflation by turning
the BAG INFLATION switch to the
‘OFF’ position to allow operator to
conduct steps 11 & 12.
Drive coupling port
Outlet tubing port
Outlet tubing port
Содержание Allegro 50 L
Страница 1: ...USD2915a Instructions For Use Allegro 50 L Single Use Mixer ...
Страница 30: ...29 20 Appendix 2 Wiring Diagrams 21 Appendix 3 General Assembly Drawings ...
Страница 31: ...www pall com biopharm 30 ...
Страница 32: ...31 ...
Страница 33: ...www pall com biopharm 32 ...
Страница 34: ...33 ...
Страница 35: ...www pall com biopharm 34 ...