5
6
4
230 mm
3
2
140 mm
FIG. 1
FIG. 3
FIG. 4
FIG. 2
8 COMMISSIONING AND USE
After having positioned the heater, it is necessary to perform the following actions:
8.1 FITTING THE DEFLECTORS AND O
2
RING (IF PROVIDED)
•
Open the door.
•
Make sure that the flue inspection valve is in closed position with the rod placed in the suitable bracket (Fig. 1).
•
Insert in sequence the deflectors and O2 Ring as shown in the diagram (Fig. 2-Fig. 3-Fig. 4).
52
Содержание WT 78F V
Страница 39: ...min 5 mm min 5 mm B Fig 3 Fig 4 Min 70 mm 4x INGLESE cod 004777090 MBL 19 12 2018 Palazzetti PN Italy 39 ...
Страница 69: ...min 5 mm min 5 mm B Fig 3 Fig 4 Min 70 mm 4x TEDESCO cod 004777090 MBL 19 12 2018 Palazzetti PN Italy 69 ...
Страница 99: ...min 5 mm min 5 mm B Fig 3 Fig 4 Min 70 mm 4x FRANCESE cod 004777090 MBL 19 12 2018 Palazzetti PN Italy 99 ...
Страница 129: ...min 5 mm min 5 mm B Fig 3 Fig 4 Min 70 mm 4x SPAGNOLO cod 004777090 MBL 19 12 2018 Palazzetti PN Italy 129 ...
Страница 151: ...1 2 4 5 6 Fig 18 SPAGNOLO cod 004777090 MBL 19 12 2018 Palazzetti PN Italy 151 ...
Страница 153: ......
Страница 154: ......
Страница 155: ......