ITALIANO
ENGLISH
DEUTSCH
FRANÇAIS
ESPAÑOL
004771070 - 17/11/2020
33
6 INSTALLATION
48
6.1 General considerations
48
6.2 Installation configurations
48
6.3 Circulation of ducted air
50
6.4 Levelling of the appliance
51
6.5 Electrical connection
51
6.6 Fuel optimisation
52
7 INITIAL CONFIGURATION
52
7.1 Configuration 1 - Room probe
53
7.2 Configuration 2 - Room thermostat
54
7.3 First start up
55
8 MAINTENANCE
56
8.1 Maintenance of the smoke system
56
8.2 Appliance maintenance
56
8.3 Cleaning and maintenance program
57
8.4 Smoke exhaust duct cleaning
58
9 DEMOLITION AND DISPOSAL
59