![PairGain 150-1303-42 Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/pairgain/150-1303-42/150-1303-42_manual_747338009.webp)
Revision 01
July 30, 1999
Section 363-703-142
FLC-703, List 4B
PairGain Engineering - Plant Series
Page 7
7.4
Verify Operation.
Verify the following after the system is powered up and HDSL communication
is synchronized:
1
Observe the front panel ACTIVE indicators are all OFF and the FAULT indicator is off (no calls
are in progress).
2
Test circuits for loop start:
a
Place an outgoing call for each subscriber circuit provisioned and observe that the
appropriate ACTIVE LED tracks the progress of the call (Table 1).
b
Place an incoming call for each subscriber circuit provisioned and observe that the
appropriate ACTIVE LED tracks the progress of the call (Table 1).
3
Test circuits for ground start (circuits must be provisioned for ground start per section 7.2):
a
Place an outgoing call for each subscriber circuit provisioned and observe that the
appropriate ACTIVE LED tracks the progress of the call (Table 1).
b
Place an incoming call for each subscriber circuit provisioned and observe that the
appropriate ACTIVE LED tracks the progress of the call (Table 1).
8. Troubleshooting
8.1
Subscriber Drop Testing.
For PG-Flex subscriber drop testing from the CO, select and connect
any subscriber drop to a metallic test pair at the RT. PG-Flex extends this connection to the COT
where it can be switched onto the test access bus or to the corresponding subscriber line on the COT
channel card.
Activate test access through the RS-232 maintenance port located on the front of the COT Line Unit
using an ASCII terminal.
8.2
Table 2 provides PG-Flex system troubleshooting procedures based on indications displayed by the
FLC-703 Channel Unit front panel LEDs or customer reported problems.
Содержание 150-1303-42
Страница 14: ......