background image

Mount BG02

Place near enough to the equipment being monitored
to ensure voltage and CT lead lengths will fit

Place within 30 feet of Packet Power Ethernet Gateway
or other Packet Power monitoring device

Use attached mounting tabs for wall mount or
the included chase nipple to install directly onto
equipment

Mounting tabs have #0.18 hole

Run CT leads from the BG02 to device being monitored

Connect CTs to the conductors

Consult the CT Specification Sheet for correct CT orientation

Connect CT tails to the CT leads coming from the BG02

CTs from full-power meters will be labeled L1, L2, L3; ensure they are placed on the proper phase

CTs from current-only meters will be labeled CT1, CT2, CT3, ... and are not phase-specific

Run the voltage leads to the voltage source and connect by line and ground

If there are multiple voltage sources, the voltage leads will be labeled accordingly

Ensure adequate over-current protection is provided

Once power is supplied, the BG02 will automatically begin to transmit data.

© 2019 Packet Power LLC

BG02 QS V1

BG02 Quick Start Guide

SERIOUS OR FATAL HAZARD WARNING:  

Ph (877) 560-8770 ext 2
www.packetpower.com

2716 Summer St. NE

Minneapolis, MN 55413

USA

Disconnect power prior to installation and ensure installation is done by a qualified person according to local electrical codes. 
Detailed information can be found at packetpower.com/support.

1

2

4

3

5