background image

BG02 Multi-circuit Power Monitor
Quick Start Guide

IMPORTANT

1.

Installation should be conducted by a qualified professional according to local electrical codes.

2.

Protective equipment should be used when handling a current transducer (CT) on a live conductor.

3.

Do not make adjustments to the BG02's internal wiring.

4

If you believe the BG02, CTs, or leads have been damaged, do not attempt to repair or use them.

COMPONENTS

Chase nipple

BG02 Multi-circuit monitor

with lock nut

Ground wire

Voltage lead(s)

CT leads with quick connectors

Current Transducers (CTs)
with quick connector

TOOLS NEEDED

12" adjustable wrench

--    to tighten chase nipple

12" adjustable claw pump pliers

--    to tighten lock nut around chase nipple

#2 Phillips screwdriver (minimum 4" shaft)

--    to remove device cover if needed

#5 drill bit

--    to make mounting holes in wall

#5 screws

--    to attach mounting tabs to wall

INSTALLATION STEPS

See next page for more detail by step.

The BG02 does not need to be configured prior to use.

Mount BG02 to wall or device using attached mounting tabs

Run CT leads from the BG02 to device being monitored

Connect CTs to the conductors

Connect CT tails to the CT leads coming from the BG02

Run the voltage leads to the voltage source and connect by line and ground

Once power is supplied, the BG02 will automatically begin to transmit data.

©

 2019 Packet Power LLC

www. packetpower.com/support

BG02 QS V1

This is a summary of how to install a Packet Power BG02 multi-circuit monitoring device. 

1

2

3

4

5

Отзывы: