background image

 

 

03/2008 

Page 35 of 35 

PN 845671 

 

 
 

 

WARRANTY POLICY 

PACIFIC LIMITED WARRANTY

 

 

The 

Pacific

 Z20T has been manufactured, tested and inspected in accordance with specific 

engineering requirements.  This machine is WARRANTED to be free from defects in 
workmanship and materials for periods as follows from the date of purchase. 
 
Ten (10) Years Parts, One (1) Year Labor – Polyethylene Components 
Five (5) Years Parts, One (1) Year Labor – Main Frame 
Two (2) Years Parts, One (1) Year Labor – Brush Drive Motors 
One (1) Year Parts & Labor – All other components unless excluded below 
 
Travel time for warranty repair is authorized for a period of ninety (90) days following the date of 
sale to the end user, with a maximum of three (3) hours per claim. 
 
This warranty extends to the original user/purchaser and only when used, operated and 
maintained in accordance with 

Pacific

 Operating and Maintenance instructions. 

 
This warranty does not apply to certain wear parts and accessories of the machine such as 
electrical cords, carbon motor brushes, floor brushes, belts, hoses, tools, squeegee blades, etc., 
nor does it apply to damage or failure caused by improper use, abuse or neglect.  Warranty 
credit of return parts including motors, pumps, etc., is subject to incoming inspection of those 
items. 
 
To secure repair under this warranty, the following procedure should be taken: 

1. 

After the expiration of the ninety (90) day travel time warranty period, the customer is 

responsible for warranty travel payment for the inoperative machine or warranted parts must be 
delivered to the authorized dealer with shipping and delivery charges prepaid.  If unable to 
locate the Dealer, you may contact 

Pacific

 at the address listed herein for the location of the 

nearest 

Pacific

 repair center or agent or for other instructions pertaining to your warranty 

difficulty. 

2. 

Upon compliance with the above warranty procedure, all warranted repairs will be completed 

at no additional charge or cost to the user. 

3. 

Only 

Pacific

 or its authorized dealers and agents may make no charge warranty repairs on 

this product.  All others do so at their own risk. 
 
This warranty limits 

Pacific

 liability to the repair of the product and/or warranted parts 

replacement and does not include incidental or consequential damages arising from the use of a 

Pacific

 machine whether defective or not. 

 

BATTERY WARRANTY 

In addition to the terms above, any original equipment 

Pacific

 battery which becomes 

unserviceable under normal use within a period of ninety (90) days from the date of sale to the 
original user will be repaired or replaced with one of equal specification at our option, F.O.B. any 
authorized 

Pacific

 sales or service branch, with no charge to user, except transportation costs.  

After the expiration of the above ninety (90) day period, any battery which fails under normal 
use will be adjusted to the original user with a new battery of equal specification on a twelve 
(12) month pro rata basis from the date of purchase.  Adjustments will be determined using the 
then current list price, plus transportation costs.  Warranty is rendered null and void if battery is 
not kept filled to the proper level with DISTILLED WATER. 
 
This warranty is in lieu of all other expressed or implied warranties and is extended to the 
original purchaser/user.

 

Содержание Z20T

Страница 1: ...pect all components to ensure that there is no concealed freight damage If such damage is discovered file a CONCEALED DAMAGE REPORT immediately with the delivering carrier FOR YOUR CONVENIENCE RECORD...

Страница 2: ...the floor 12 Do not turn the machine on an incline Do not stop and leave the machine on a ramp or incline 13 During any maintenance operation disconnect the power supply from the machine 14 Lead acid...

Страница 3: ...tor Brush Drive Motor Control Switch Vacuum Motor Control Switch Brush Release Switch Battery Charge Indicator Main Machine Power Key Switch Forward Reverse Traction Drive Switch Traction Drive Speed...

Страница 4: ...vacuum motor support d Using a ramp pull the machine off the pallet e Reconnect traction motor black lead wire 2 BATTERY INSTALLATION a Remove the squeegee hose from the recovery tank b Remove the va...

Страница 5: ...TOR The battery indicator is digital with 4 display levels and a flashing one The numbers which appear on the display show the approximate charge level 4 represents a full charge and 0 represents disc...

Страница 6: ...e wear Rotate the adjusting knobs counter clockwise to lower squeegee and clockwise to lift it NOTE Rotate the right and left adjusting knobs until the squeegee is positioned parallel to the floor 6 A...

Страница 7: ...minimum amount of detergent necessary Reassemble the cover WARNING Always use low foaming detergent Adding antifoam liquid into the recovery tank before cleaning will also help prevent foaming NEVER...

Страница 8: ...rate and raising the lever decreases the flow rate There should be enough solution to wet the floor uniformly but not so much that the water gets past the splash guard Remember that the correct solut...

Страница 9: ...ckwards 11 SCRUBBING Depress the handle switch lever The scrub brush will begin to rotate and solution will begin to flow During the first few yards of operation check that the quantity of the cleanin...

Страница 10: ...f the squeegee is not raised during storage or transport 5 Switch off main power key switch 6 Switch off the water solenoid valve switch 7 Switch off the brush motor switch 8 Switch off the vacuum mot...

Страница 11: ...by rotating it counter clockwise 4 Remove the filter and its housing 5 Rinse the tank with clean water CLEANING THE VACUUM FILTER 6 Lift the cover 7 Take off the vacuum cover by rotating it counter c...

Страница 12: ...DES Check the squeegee blades for wear and if necessary change them To replace the squeegee blades 18 Remove the squeegee vacuum hose from its port 19 Lift locking latches and pull squeegee assembly r...

Страница 13: ...5 Turn on brush motor switch 26 Depress handle switch lever to start the brush spinning 27 Release handle switch lever and quickly depress brush release switch The brush or pad driver will release and...

Страница 14: ...e the fill cap from the solution tank 6 Rinse with clear water 7 Remove the solution tank drain hose and cap at rear of machine and empty the solution tank WARNING Use gloves for protection from conta...

Страница 15: ...Page 15 of 35 WATER SOLENOID MAINTENANCE In the event that the water solenoid begins to leak when turned off debris must be cleared at the valve seat Water Solenoid...

Страница 16: ...UEEGEE DOES NOT DRY THE FLOOR WELL a Check that the squeegee blades are clean b Adjust the inclination of the squeegee c Confirm the vacuum hose is correctly fitted into its port in the recovery tank...

Страница 17: ...Page 17 of 35 Brush Deck Assembly Drawing 1...

Страница 18: ...ZINC 888241 Bearing Spacer 1 ZINC 888340 Spring 1 ZINC 888341 Spring 1 ZINC 888342 Spring 1 ZINC 902031 Bearing 2 902032 Bearing 3 903016 Belt 1 920033 M4 Hexagon Lock Nut 8 920649 Hex Nut M8 Zinc 2...

Страница 19: ...Page 19 of 35 Main Frame Assembly Drawing 2...

Страница 20: ...pring 1 849005 Tubing 1 849006 Tubing 1 849703 Castor 2 849705 Main Wheel 2 911529 Microswitch 1 920648 M12 Nyloc Hex Nut Zinc 3 920649 Hex Nut M8 Zinc 6 920653 M6 Nyloc Hex Nut Zinc 14 924032 M5 Nylo...

Страница 21: ...Page 21 of 35 Squeegee Arm Assembly Drawing 3...

Страница 22: ...od End Male M12 Zinc 1 847702 Squeegee Adjuster Front Shaft 1 ZINC 847703 Squeegee Adjuster Rear Shaft 1 ZINC 848302 SPRING 1 ZINC 848303 Spring Squeegee Adjust 2 ZINC 848401 Squeegee Wheel Adjusting...

Страница 23: ...Page 23 of 35 Squeegee Assembly Drawing 4...

Страница 24: ...04 Latch ASM 2 ZINC 845105 Squeegee Attachment Block Latch 2 ZINC 881145 Wheel Bushing 2 889742 Wheel 45 Dia 2 920649 Hex Nut M8 Zinc 2 924033 NyLoc Hex Nut M8 Zinc 2 925009 Roll Pin M5 5x12 SS 1 9300...

Страница 25: ...Page 25 of 35 Solution Tank Assembly Drawing 5...

Страница 26: ...ring 1 ZINC 848603 Z20 Z26 Solution Tank 1 EPOXY PAINT 849008 Drain Tubing Solution Tank 1 849402 Valve 1 882440 Hook 1 CHROMATE 885044 Knob 1 886852 Cap 1 920615 Hex Nut M5 Zinc 1 924051 M5 Retaining...

Страница 27: ...Page 27 of 35 Recovery Tank Assembly Drawing 6...

Страница 28: ...older 1 848101 Sleevee 2 848103 Sleeve For Lift 1 848604 Z20 Z26 Recovery Tank 1 EPOXY PAINT 849004 Tubing 1 882440 Hook 1 CHROMATE 882442 Vacuum Outlet Port 1 883343 Filter Basket 1 883344 Float 1 88...

Страница 29: ...Page 29 of 35 Vacuum Assembly Drawing 7...

Страница 30: ...cuum Motor SIX 1 845603 Muffler 1 847405 Rod Connecting 1 ZINC 911441 Connector Male 50A 1 911442 Connector Female 50A 1 911531 Hose Clamp 1 920033 M4 Hexagon Lock Nut 4 ZINC 920653 M6 Nyloc Hex Nut Z...

Страница 31: ...Page 31 of 35 Switch Box Assembly Drawing 8...

Страница 32: ...911424 Fuse 30Amp 1 911427 Trigger Switch 1 911428 Key Switch 1 911429 Speed Controller 1 911430 Potentiometer 1 911431 Fuse 3Amp 1 911440 Jumper Wire 1 911443 Fuse 50Amp 1 911527 Brush Motor Relay 1...

Страница 33: ...Page 33 of 35 Electrical Schematic Drawing 9...

Страница 34: ...Harness 1 844566 Wire Harness 1 844567 Wire Harness 1 844568 Wire Harness 1 844569 Wire Harness 1 844570 Wire Harness 1 844571 Wire Harness 1 844572 Wire Harness 1 844573 Wire Harness 1 844574 Wire Ha...

Страница 35: ...horized dealer with shipping and delivery charges prepaid If unable to locate the Dealer you may contact Pacific at the address listed herein for the location of the nearest Pacific repair center or a...

Отзывы: