
SECTION 3
INSTALLATION
26
3.4.3 CONFIGURE GPIB DEVICE ADDRESS
Set the GPIB DEVICE ADDRESS as desired. The GPIB device address is set via the UPC STATUS
display screen. Default address is 1. See paragraph 4.6.3.3 for configuration.
NOTE:
IEEE-488 type cables with 90º "cable to connector" bends may interfere with other interface
connectors on the SCU and some power source model's rear panels. It is recommended that a straight
"cable to connector" IEEE-488 cable be used (e.g. NATIONAL INSTRUMENTS type X5) or a 90º
adapter may be used to provide needed clearance.
3.4.4 CONFIGURE MISCELLANEOUS SETTINGS
NOTE:
Most users will not need to concern themselves with the unit’s configuration settings as it is set
at the factory if the UPC is packaged with a power source.
These settings are set by SWITCH S1 on the UPC INTERFACE PCB (figure 3.4.4) and SWITCH S2 on
the UPC METERING PCB (figure 3.4.1).
DIP-SWITCH CONFIGURATION SETTINGS
PCB
FIGURE
Switch
Position
Description
INTERFACE 3.4.4
S1-1
ON
Current transformer on primary side of XFMR
S1-1
OFF
Current transformer on secondary side of XFMR
INTERFACE 3.4.4
S1-2
ON
1 PA installed
S1-2
OFF
See METERING PCB SW2-7 below
INTERFACE 3.4.4
S1-5
ON
RS-232 INTERFACE INSTALLED
S1-5
OFF
IEEE-488 INTERFACE INSTALLED
INTERFACE 3.4.4
S1-6
ON
FRONT PANEL INSTALLED
S1-6
OFF
FRONT PANEL NOT INSTALLED. Allows for
maximum REMOTE INTERFACE performance.
INTERFACE 3.4.4
S1-7
ON
METERING PCB INSTALLED
S1-7
OFF
METERING PCB NOT INSTALLED. Allows for
enhanced Transient and REMOTE INTERFACE
performance. OFF position ignored if CSC is
enabled.
INTERFACE 3.4.4
S1-8
ON
Φ
B AND
Φ
C OSCILLATOR PCBS INSTALLED;
Allows for 3
Φ
operation.
S1-8
OFF
Φ
B AND
Φ
C OSCILLATOR PCBS NOT INSTALLED
METERING
3.4.1
S2-7
ON
2 power amplifiers installed
S2-7
OFF
3 power amplifiers installed
Содержание UPC-32
Страница 1: ...UPC 32 UPC 12 PROGRAMMABLE CONTROLLERS FIRMWARE V2 53 AND LATER OPERATION MANUAL PACIFIC POWER SOURCE...
Страница 2: ......
Страница 12: ...SECTION 1 GENERAL viii THIS PAGE INTENTIONALLY BLANK...
Страница 17: ...SECTION 1 GENERAL 5 PACIFIC Figure 1 3a SCU UPC 32 Figure 1 3b UPC 32 Figure 1 3c UPC 12...
Страница 46: ...SECTION 4 OPERATION 34 PA CIFIC FIGURE 4 1 POWER SOURCE FRONT PANEL...
Страница 77: ...SECTION 4 OPERATION 65 90 0 100 0 85 95 100 90 FIGURE 4 6 2 1 EDITED WAVEFORM...
Страница 139: ...NOTES 127 NOTES...
Страница 140: ...MODIFICATIONS 128 MODIFICATIONS MODIFICATIONS This section is reserved for any modifications that may be made...