2
CONSTRUCTION
EQUIPMENT COMPANY
OPERATORS A N D MAINTENANCE
MANUAl
BRAKES
THE FOUR WHEEL SELF-CENTERING BRAKES BRING THE CAR TO A SMOOTH QUICK STO
P
.
THE BRAKE SHOES ARE FITTED WITH HEAVY DUTY REPLACEABLE IRON LINERS AND A LL
FOUR TOGGLE LINKS ARE A D JUSTABLE.
A HAND BRAKE LEVER EXTENDS INTO THE COCK-
PIT AND CAN BE
�
ATCHED . INTO THE 110N11 POSITION FOR USE AS A PARKING BRAKE.
CONTROLS
THE BRAKE LEVER IS FITTE D ON THE FLOOR ADJACENT TO THE DRIVER.
IN A WELL
NEXT TO THE DRIVER ARE FITTED THE ENGINE TRANSMISSION LEVER, A CHOKE AND A
THROTT LE LEVER.
INSTRUMENT PANEL
THE INSTRUMENT PANEL HOUSES AN IGNITION SWITCH, A STARTER BUTTON, AND
IGNITION, OIL PRESSURE AND WATER TEMPERATURE LIGHTS.
HORN BUTTON ARE OPTIONA L.
FUEL SYSTEM
A LIGHT SWITCH AND
A
10
GALLON FUEL TANK IS FITTED UNDER THE DRIVER'S SEAT, ACCESS IS BY
LIFTING THE SEAT.
FUE L IS SUPPLIED TO THE CARBURATOR THROUGH A FILTER BOWL.
COOLING SYSTEM
;:;;;•.
A RADIATOR IS MOUNTED IN FRONT OF THE RAI L CAR.
TURNTABLE
A TURNTABLE IS FITTE D BE LOW THE FRAME.
IT CAN0 BE LOWERED AND RAISED
HYDRAU LICALLY BY MEANS OF A HAND PUMP, TWO RAMS AND AN ISO LATION VA LVE.
OPERAT ION
PREPARING FOR SERVICE
USING A GREASE GUN WITH GREASE THAT WIL L NOT CONGEAL
.H
4Q°F
BELOW ZERO AND
WIL L NOT F LOW AT
275°F
ABOVE ZERo, GREASE THE DIFFERENTIA L AXLE S LEEVE ON
THE FRONT AXLE; EACH BRAKE SHAFT BEARING, AND EACH AXLE BEARING.
CHECK 01L
LEVE L IN ENGINE, TRANSMISSION AND GEAR BOX.
CHECK WATER LEVEL IN RADIA
T
OR.
CHECK THAT FUEL TANK IS FU L L .
.
CHECK THAT TURNTABLE IS FULL RAISED.
STARTING THE ENGINE
1.
2.
ENSURE THAT SHIFT LEVER FROM ENGINE TRANSMISSION IS IN NEUTRA L AND
THAT BRAKE IS SET AND LOCKED.
IN GEAR.
THE DIRECTIONA L GEARBOX SHOU LD BE
START ENGINE IN ACCORDANCE WITH �IANUFACTURERS INSTRUCT IONS.
3.
AL LOW A CO L D ENGINE TO RUN A FEW MINUTES TO WARM UP BEFORE PULLING
LOADS.
()
)
.)
Содержание A5A Railcar
Страница 1: ...C OPERATING MAINTENANCE REPLACEMENT PARTS MANUAL A5A flAILCA5f ...
Страница 2: ...t 0 ...
Страница 8: ...11 Figure 1 Frame and Deck Housing page 2 J ...
Страница 10: ... I I I 1 Figure 2 Front Axle Assembly page 4 0 0 ...
Страница 12: ...page 6 Figure 3 I 27 Drive Axle and Reversa Gear Assembly 11 C ...
Страница 14: ...Figure 4 Wheels AxUe Bea rmns page 8 J J ...
Страница 16: ...Figure 5 Engine and Transmission page 10 ___JL____ J ...
Страница 18: ...0 0 J ...
Страница 20: ...2 5 8 7 Figure 6 page14 Fuel Group Rear Tow Bar 1 6 J rJ ...
Страница 22: ...4 12 Figure 7 Instrument Group and Lighting Option page16 10 11 ...
Страница 24: ...page 18 Figure 8 Battery 6roup 2 4 1 ...
Страница 26: ... 0 ...
Страница 28: ... 8 page 22 Figure 9 Linka e Forward Reverse Torque Arms I ...
Страница 30: ...page24 3 1 Figure 10 Handbrake Assembly ...
Страница 32: ...2 I 12 8 10 7 page26 9 3 6 6 Fi iure 11 Hydraulic Circuit 5 4 I 4 5 1 4 1 ...
Страница 34: ...4 2 6 page 28 Figure 12 Seating 2 1 ...
Страница 36: ...page30 Figure 13 l rake Group J ...
Страница 38: ...page32 11 l Figure 14 T11mtable Assembly Optional 2 1 ...
Страница 40: ... 0 ...
Страница 42: ...J 0 Figure 15 Canopy with Curtains page36 J ...
Страница 44: ...J ...
Страница 46: ...0 ...
Страница 48: ...0 ...