![Pacific Hoists U-MEGA Series Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/pacific-hoists/u-mega-series/u-mega-series_operations-manual-and-parts-list_3151970010.webp)
9
(Illust. 2)
Firm and steady button operation is required. Never push the button switch intermittently.
Always avoid excessive inching operation.
Always make sure the hoist motor completely stops before reversing.
Always leave the push button switch cable and bottom hook vertically static after completion of
operation, never leave them at any position which may cause swing or slip.
Slings must be applied to load evenly and centrally to ensure correct balance. Never lift any
object which is insecure or out of balance.
Never use hoist to end or side pull a load. (Illust. 3)
Never wrap around and hook back the load chain as a sling to lift a load. (Illust. 4)
(Illust. 3) (Illust. 4)
Do not use the hoist chain as a welding electrode.
Never stand under a raised load (Illust. 5)
Содержание U-MEGA Series
Страница 20: ...19 7 TROUBLESHOOTING 7 1 Wiring Diagrams ...
Страница 25: ...24 ...
Страница 29: ...28 41 408335 Hex Recess Bolt M6 1 0 40 8 408660 Hex Recess Bolt M6 1 0 35 6 ...
Страница 42: ...41 ...
Страница 49: ...48 ...
Страница 50: ...49 12 11 ELECTRIC ASSEMBLY 6 10 1 2 3 4 5 8 9 7 13 14 15 16 17 18 ...
Страница 52: ...51 ...